Gida › Masu Aiki › Imr Soft LLC › Java Full Stack Developer
Java Full Stack Developer a Imr Soft LLC: Albashin H-1B
8 nacewar yanayin aiki don matsayin aiki Java Full Stack Developer a Imr Soft LLC. Tsakiyar albashin tushe da aka ba da shi $106,500; tsakiyar rabi $95,150–$107,300.
Aikace-aikace (LCAs)8
Albashin da aka tsara a matsakaici$106,500
Tsakiyar albashi$95,150–$107,300
Kashi na 10 zuwa na 90$81,620–$108,530
Ta shekarar bincike
| Shekarar kuɗi | LCAs | Albashin tsakiya |
|---|---|---|
| FY2023 | 4 | $103,600 |
| FY2025 | 4 | $106,500 |
Nacewar
| Albashin tushe | Wuri | An Gabatar | Ranar farawa | Matsayi |
|---|---|---|---|---|
| $77,000 Mataki II | Norfolk, VA | 19 Yun, 2025 | 1 Okt, 2025 | An tabbatar |
| $107,000 Mataki II | Iselin, NJ | 18 Yun, 2025 | 1 Okt, 2025 | An tabbatar |
| $107,000 Mataki II | Edison, NJ | 10 Yun, 2025 | 1 Okt, 2025 | An tabbatar |
| $106,000 Mataki II | Denton, TX | 28 Afi, 2025 | 19 May, 2025 | An tabbatar |
| $99,000 Mataki II | Irving, TX | 26 Yun, 2023 | 3 Yul, 2023 | An tabbatar |
| $108,200 Mataki II | Boston, MA | 8 Yun, 2023 | 12 Yun, 2023 | An tabbatar |
| $83,600 Mataki II | Concord, NH | 18 May, 2023 | 1 Okt, 2023 | An tabbatar |
| $109,300 Mataki II | Pearl River, NY | 28 Afi, 2023 | 8 May, 2023 | An tabbatar |
Java Full Stack Developer a duk masu aiki →
Wasu ayyuka a Imr Soft LLC
- Software Developer$106,000
- Java Developer$107,500
- Software Engineer$106,000
- Data Engineer$99,000
- Sr. Performance Engineer$99,500
- DevOps Engineer$106,500
- Salesforce Developer$108,012
- Technical Architect$142,750
- Security Engineer$151,882
- Site Reliability Engineer$96,500
- Hadoop Administrator$86,500
- GenAI Engineer$106,000
Albashin su ne ƙasan albashin da aka bayar a kowane aikace-aikace, wanda aka juya zuwa jimillar shekara; ƙididdiga suna amfani da aikace-aikacen cikakken lokaci da aka tabbatar da su kawai. LCA ba amincewa da visa ba ce, kuma LCA ɗaya na iya rufe mukamai da yawa. Tushe: Ma'aikatar Aiki ta Amurka, Bayanan OFLC LCA Disclosure, shekarun budiye 2023–2026 (shawarar karshe 30 Yun, 2026).