Akèy › Anplwayè › Structure Tone Southwest LLC
Structure Tone Southwest LLC: Salè H-1B ak pajon
Structure Tone Southwest LLC depoze 3 aplikasyon kondisyon travay pou visa H-1B ak visa ki gen rapò nan ane fiskal 2023–2026; sètifye: 3. Medyèn salè yo ofri a: $77,459.
Èske Structure Tone Southwest LLC pajone visa H-1B?
Structure Tone Southwest LLC depoze 3 aplikasyon kondisyon travay nan ane fiskal 2023–2026, dènye a soumèt sou Apr 16, 2025. Yon LCA se premye etap yon demann H-1B, konsa anplwayè a pajone oswa prepare pou pajone travayè H-1B; li pa garanti pajon pou okenn travay espesifik. Tcheke lis travay pwòp anplwayè a.
Salè pa tit travay
| Tit travay | LCA | Salè medyan |
|---|---|---|
| Project Engineer | 2 | $72,301 |
| Estimator | 1 | $77,459 |
Aplikasyon pa ane fiskal
| Ane fiskal | LCA | Salè medyan |
|---|---|---|
| FY2024 | 1 | $66,602 |
| FY2025 | 2 | $77,730 |
Nivo salè prevanlan
Depatman Travay la etabli kat nivo salè prevanlan pou chak okipasyon ak zòn, soti nan Nivo I (antre) rive nan Nivo IV (plen kompetans). Anplwayè a chwazi nivo ki koresponn ak kondisyon travay la.
Kote travay yo ye
Okipasyon
Dènye aplikasyon yo
| Tit travay | Salè baz | Kote | Soumèt | Dat kòmansman | Estati |
|---|---|---|---|---|---|
| Project Engineer | $78,000 Nivo I | Garland, TX | Apr 16, 2025 | Oct 1, 2025 | Certifye |
| Estimator | $77,459–$84,220 Nivo III | Dallas, TX | Oct 1, 2024 | Oct 7, 2024 | Certifye |
| Project Engineer | $66,602–$77,000 Nivo I | Dallas, TX | May 1, 2024 | Oct 1, 2024 | Certifye |
Salè yo se fen ki pi ba nan salè yo ofri sou chak aplikasyon, konvèti nan yon montan anyèl; estatistik yo itilize sèlman aplikasyon tan plen sètifye. Yon LCA pa yon apwobasyon visa epi yon sèl LCA ka kouvri plizyè pozisyon. Sous: Depatman Travay Etazini, Done Divulgasyon LCA OFLC, ane fiskal 2023–2026 (dènye desizyon Jun 30, 2026).