GHD, Inc.: sponso kat vèt (PERM)
GHD, Inc. te depoze 4 aplikasyon sètifikasyon travay PERM ki te pran desizyon pandan ane fiskal 2024–2026; sètifye: 4. Mwayèn salè yo ofri $126,678; mwayèn tan soti nan depozisyon jiska sètifikasyon: 494 jou.
Aplikasyon PERM4
Sètifye4
Salè medyan ofri$126,678
Mwayèn jou pou sètifikasyon494
Deja ap travay pou anplwayè a100%
Anplwaye (jan yo depoze)92
Nan biznis depi2006
Adrès anplwayèHouston, TX
Tit travay
| Tit travay | Aplikasyon PERM | Salè medyan |
|---|---|---|
| Senior Engineer | 1 | $115,357 |
| Construction Inspector | 1 | $72,000 |
| Senior Project Engineer, Water/Wastewater Treatment | 1 | $138,000 |
| Americas Advisory Business Group Leader & Vice President | 1 | $185,286 |
Kote travay
Okipasyon
Dènye desizyon
| Tit travay | Salè baz | Kote | Soumèt | Deside | Estati | Jou |
|---|---|---|---|---|---|---|
| Americas Advisory Business Group Leader & Vice President | $185,286–$309,781 | Irvine, CA | Apr 29, 2025 | Jun 8, 2026 | Sètifye | 405 |
| Senior Project Engineer, Water/Wastewater Treatment | $138,000–$207,000 | Irvine, CA | Aug 22, 2024 | Jan 7, 2026 | Sètifye | 503 |
| Construction Inspector | $72,000–$108,000 | Tamuning, GU | Dec 22, 2023 | Jun 5, 2025 | Sètifye | 531 |
| Senior Engineer | $115,357–$141,600 | Bowie, MD | Jan 15, 2024 | May 14, 2025 | Sètifye | 485 |
Salè yo se pi ba nivo salè yo ofri nan chak aplikasyon, konvèti an yon montan anyèl; estatistik yo itilize aplikasyon plen tan ki sètifye. Sètifikasyon PERM se yon etap nan direksyon yon kat vèt; USCIS pran desizyon sou petisyon an. Se pa konsèy legal. Sous: Depatman Travay Etazini, Done Divilgasyon OFLC PERM, ane fiskal 2024–2026 (dènye desizyon Jun 30, 2026).