Akèy › Metiyè › Materials Scientists › Oak Ridge, TN
Materials Scientists nan Oak Ridge, TN: Salè H-1B
160 aplikasyon kondisyon travay pou okipasyon sa a ak yon sit travay nan Oak Ridge, TN. Salè baz medyàn ofri $87,480; mwatye mitan $80,655–$120,979.
Pa nivo salè
| Nivo revni | Salè medyan |
|---|---|
| Nivo I (antre) | $85,328 |
| Nivo II (kalifye) | $85,746 |
| Nivo III (eksperyans) | $125,466 |
| Nivo IV (plen kompetans) | $194,657 |
Depatman Travay la etabli kat nivo salè prevanlan pou chak okipasyon ak zòn, soti nan Nivo I (antre) rive nan Nivo IV (plen kompetans). Anplwayè a chwazi nivo ki koresponn ak kondisyon travay la.
Anplwayè yo
| Anplwayè | LCA | Salè medyan |
|---|---|---|
| Ut-Battelle, LLC (oak Ridge National Laboratory) | 157 | $87,443 |
| University of Maryland College Park | 1 | $51,500 |
| UT-Battelle, LLC (ORNL) | 1 | $95,004 |
| Theiss Research | 1 | $108,400 |
Tit travay
- Postdoctoral Research Associate - Materials Theory5
- Postdoc - Growth Mechanisms of 2D Materials & Nanomaterials4
- Postdoc Research Assoc - Polymer & Ceramic Comp Electrolytes3
- Physical Metallurgy of Lightweight Alloys - R&D Associate3
- R&D Associate - High Temperature Corrosion3
- Materials Joining - R&D Associate3
- R&D Associate - Decarbonization of Polymer Products2
- Postdoc Res Assoc - STEM for Quantum and Energy Materials2
- R&D Associate - Materials Scientist, Nuclear Structures2
- Electron Microscopist/Spectroscopist - R&D Associate2
- Postdoctoral Research Associate - Photon-based Spectroscopy2
- Postdoctoral Research Associate - STM Of Quantum Materials2
- R&D Associate - Designing Composites for Modeled Performance2
- Postdoc Res Assoc - Atomic Structure of Correlated Materials2
- Postdoc -Additive Manufacturing & Characterization of Steels2
Pwonse H-1B nan Oak Ridge, TN →
Salè yo se fen ki pi ba nan salè yo ofri sou chak aplikasyon, konvèti nan yon montan anyèl; estatistik yo itilize sèlman aplikasyon tan plen sètifye. Yon LCA pa yon apwobasyon visa epi yon sèl LCA ka kouvri plizyè pozisyon. Sous: Depatman Travay Etazini, Done Divulgasyon LCA OFLC, ane fiskal 2023–2026 (dènye desizyon Jun 30, 2026).