Fuula Jalqabaa › Tajaajiltoota › Hutchison Engineering, Inc.
Hutchison Engineering, Inc.: Baajannaa H-1B fi deggera
Hutchison Engineering, Inc. iyyannoo hojii haala 17 H-1B fi viizaa walitti dhufeenya qaban bara maallaqaa 2023–2026 irratti galche; mirkaneessame: 15. Baajannaa giddugaleessaa dhiyaate: $76,149.
Hutchison Engineering, Inc. viizaa H-1B deggeraa?
Hutchison Engineering, Inc. bara maallaqaa 2023–2026 irratti iyyannoo hojii haala 17 galche, kan haaraan 07-Cam-2026 irratti dhiyaate. LCA tarsiimoo jalqabaa iyyannoo H-1B ti, hojii kennaan hojjettoota H-1B deggereera yookaan deggeruuf qophii ta'eera; hojii adda addaaf deggera hin mirkaneessu. Galmee hojii hojii kennaa isaa ilaali.
Kaardii Cee'aa (PERM) ijaarsaa Hutchison Engineering, Inc.: 3 →
Baajannaa maqaa hojii irratti
| Mata-duree hojii | LCAs | Baasii giddu-galeessaa |
|---|---|---|
| Design Engineer | 11 | $80,910 |
| Civil Engineer | 6 | $76,149 |
Iyyannoo bara maallaqaa irratti
| Bara maallaqaa | LCAs | Baasii giddu-galeessaa |
|---|---|---|
| FY2023 | 5 | $76,149 |
| FY2024 | 2 | $73,518 |
| FY2025 | 3 | $72,036 |
| FY2026 | 7 | $83,408 |
Sadarkaa baajannaa olaanaa
Dhaabbanni Hojii sadarkaa baajannaa olaanaa afur hojii tokkoo tokkoo fi bakkaaf, Sadarkaa I (jalqabaa) hanga Sadarkaa IV (guddisaa) jiru, kaa'a. Hojii kennaan sadarkaa hojii sanaaf madaalu filata.
Hojiiwwan eessa jiru
Hojiiwwan
Iyyannoo haaraa
| Mata-duree hojii | Baasii bu'uuraa | Bakka | Dhiyaate | Guyyaa jalqabaa | Haala |
|---|---|---|---|---|---|
| Design Engineer | $83,408 Sadarkaa I | Jacksonville, IL | 07-Cam-2026 | 01-Onk-2026 | Mirkaneffame |
| Design Engineer | $83,408 Sadarkaa II | Jacksonville, IL | 07-Cam-2026 | 01-Onk-2026 | Mirkaneffame |
| Design Engineer | $80,910 Sadarkaa I | Jacksonville, IL | 07-Cam-2026 | 01-Onk-2026 | Mirkaneffame |
| Design Engineer | $89,784 Sadarkaa II | Carbondale, IL | 07-Cam-2026 | 01-Onk-2026 | Mirkaneffame |
| Design Engineer | $89,784 Sadarkaa I | Carbondale, IL | 07-Cam-2026 | 01-Onk-2026 | Mirkaneffame |
| Design Engineer | $89,784 Sadarkaa I | Carbondale, IL | 07-Cam-2026 | 01-Onk-2026 | Haqame |
| Design Engineer | $89,784 Sadarkaa II | Carbondale, IL | 07-Cam-2026 | 01-Onk-2026 | Haqame |
| Design Engineer | $72,036 Sadarkaa I | Carbondale, IL | 16-Elb-2025 | 01-Onk-2025 | Mirkaneffame |
| Design Engineer | $72,036 Sadarkaa II | Hannibal, MO | 16-Elb-2025 | 01-Onk-2025 | Mirkaneffame |
| Civil Engineer | $100,224 Sadarkaa II | Hannibal, MO | 19-Hag-2024 | 01-Onk-2024 | Mirkaneffame, erga haqamee |
| Design Engineer | $74,536 Sadarkaa I | Peoria, IL | 13-Wax-2024 | 01-Onk-2024 | Mirkaneffame |
| Design Engineer | $72,500 Sadarkaa I | Jacksonville, IL | 11-Wax-2024 | 01-Onk-2024 | Mirkaneffame |
| Civil Engineer | $68,382 Sadarkaa I | Jacksonville, IL | 05-Wax-2023 | 01-Onk-2023 | Mirkaneffame |
| Civil Engineer | $76,149 Sadarkaa II | Jacksonville, IL | 27-Elb-2023 | 01-Onk-2023 | Mirkaneffame |
| Civil Engineer | $76,624 Sadarkaa II | Carbondale, IL | 27-Elb-2023 | 01-Onk-2023 | Mirkaneffame |
| Civil Engineer | $74,124 Sadarkaa II | Carbondale, IL | 19-Elb-2023 | 01-Onk-2023 | Mirkaneffame |
| Civil Engineer | $76,149 Sadarkaa II | Jacksonville, IL | 19-Elb-2023 | 01-Onk-2023 | Mirkaneffame |
Baajanni gatii gadii gatii hojii iyyannoo tokkoo tokkoon irratti dhiyaate yoo ta'u, gara baajannaa waggaatti jijjiirame; lakkoofsa hojii guutuu hamma guyyaa guutuu qofa fayyadama. LCA mirkaneessa viizaa miti; LCA tokko hojii hedduu haguuchuuf ni danda'a. Madda: Dhaabbata Hojii Ameerikaa, OFLC LCA Disclosure Data, bara maallaqaa 2023–2026 (murtii haaraa 30-Wax-2026).