Dachaigh › Luchd-obrach › Cadence Design Systems, Inc. › Lead Application Engineer
Lead Application Engineer aig Cadence Design Systems, Inc.: Tuarastalan H-1B
71 iarrtasan cumhaichean-obrach airson an dreuchd Lead Application Engineer aig Cadence Design Systems, Inc.. Tuarastal bunasach meadhanach $130,354; leth meadhanach $118,508–$139,443.
Iarrtasan (LCAs)71
Tuarastal meadhanach a chaidh a thabhann$130,354
Leath mheadhanach nan tuarastalan$118,508–$139,443
Ceudail 10mh–90mh$104,472–$153,061
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 14 | $127,920 |
| FY2024 | 12 | $129,892 |
| FY2025 | 16 | $139,246 |
| FY2026 | 29 | $130,723 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $127,709–$191,100 | San Jose, CA | 23 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $109,619–$175,500 | Austin, TX | 18 Ògmh 2026 | 1 Iuch 2026 | Dearbhaichte |
| $127,709–$191,100 | San Jose, CA | 16 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $127,709–$191,100 | San Jose, CA | 16 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $139,235–$191,100 Ìre II | San Jose, CA | 11 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $139,235–$191,100 Ìre II | San Jose, CA | 9 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $112,362–$175,000 Ìre II | Austin, TX | 8 Ògmh 2026 | 21 Sult 2026 | Dearbhaichte |
| $139,235–$191,100 Ìre II | San Jose, CA | 3 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $119,704–$169,000 Ìre III | Novi, MI | 1 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $112,362–$175,500 Ìre II | Austin, TX | 6 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $93,642–$171,600 Ìre II | Farmington Hills, MI | 6 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $110,512–$171,600 | Farmington Hills, MI | 6 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $156,853–$191,000 Ìre II | San Jose, CA | 6 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $116,771–$171,600 Ìre IV | Hollidaysburg, PA | 6 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $153,061–$191,000 | San Jose, CA | 3 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $124,485–$191,000 | San Jose, CA | 3 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $134,809–$175,500 | Austin, TX | 3 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $119,704–$169,000 Ìre III | Novi, MI | 3 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $153,061–$191,100 | San Jose, CA | 3 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $135,907–$175,500 Ìre III | Austin, TX | 3 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $134,809–$175,500 | Austin, TX | 3 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $151,513–$191,100 | San Jose, CA | 18 Màrt 2026 | 6 Gibl 2026 | Dearbhaichte |
| $156,853–$191,100 Ìre II | San Jose, CA | 4 Màrt 2026 | 21 Lùna 2026 | Dearbhaichte |
| $130,723–$171,600 | Hillsboro, OR | 2 Màrt 2026 | 21 Lùna 2026 | Dearbhaichte |
| $108,671–$171,600 | Burlington, MA | 2 Màrt 2026 | 21 Lùna 2026 | Dearbhaichte |
| $112,362–$175,500 Ìre II | Austin, TX | 2 Faoi 2026 | 3 Iuch 2026 | Dearbhaichte, an uair sin air a tharraing air ais |
| $139,630–$175,500 Ìre III | Austin, TX | 16 Dùbh 2025 | 5 Faoi 2026 | Dearbhaichte |
| $150,799–$185,900 | San Jose, CA | 13 Samh 2025 | 1 Dùbh 2025 | Dearbhaichte |
| $139,235–$185,900 Ìre II | San Jose, CA | 4 Samh 2025 | 20 Gearr 2026 | Dearbhaichte |
| $166,650–$185,900 | San Jose, CA | 17 Sult 2025 | 22 Sult 2025 | Dearbhaichte |
| $166,650–$185,900 | San Jose, CA | 5 Sult 2025 | 22 Sult 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| $139,235–$185,900 Ìre II | San Jose, CA | 22 Lùna 2025 | 23 Faoi 2026 | Dearbhaichte |
| $140,733–$185,900 Ìre IV | Ontario, CA | 22 Lùna 2025 | 9 Faoi 2026 | Dearbhaichte |
| $132,142–$185,900 Ìre II | San Jose, CA | 22 Lùna 2025 | 19 Dùbh 2025 | Dearbhaichte |
| $135,640–$169,000 | Austin, TX | 26 Ògmh 2025 | 7 Iuch 2025 | Dearbhaichte |
| $117,312–$169,000 Ìre II | Austin, TX | 21 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $135,640–$169,000 | Austin, TX | 21 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $104,472–$185,900 | San Jose, CA | 7 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $139,256–$185,900 Ìre II | San Jose, CA | 18 Màrt 2025 | 26 Lùna 2025 | Dearbhaichte |
| $139,256–$185,900 Ìre II | San Jose, CA | 13 Gearr 2025 | 13 Ògmh 2025 | Dearbhaichte |
| $149,367–$185,900 | San Jose, CA | 6 Gearr 2025 | 14 Màrt 2025 | Dearbhaichte |
| $126,118–$185,900 | San Joes, CA | 17 Faoi 2025 | 6 Ògmh 2025 | Dearbhaichte |
| $104,166–$165,100 Ìre II | Hillsboro, OR | 17 Faoi 2025 | 4 Iuch 2025 | Dearbhaichte |
| $148,210–$185,900 | San Jose, CA | 17 Dàmh 2024 | 4 Samh 2024 | Dearbhaichte |
| $169,770–$185,900 Ìre III | San Jose, CA | 30 Iuch 2024 | 10 Sult 2024 | Dearbhaichte |
| $147,066–$185,900 | San Jose, CA | 26 Ògmh 2024 | 15 Iuch 2024 | Dearbhaichte |
| $124,904–$165,100 Ìre III | Cary, NC | 25 Ògmh 2024 | 13 Dùbh 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| $147,066–$185,900 | San Jose, CA | 28 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $130,054–$169,000 | Austin, TX | 22 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $121,585–$169,000 | Austin, TX | 3 Cèit 2024 | 11 Sult 2024 | Dearbhaichte |
| $146,459–$185,900 | San Jose, CA | 22 Màrt 2024 | 7 Lùna 2024 | Dearbhaichte |
| $97,698–$158,600 Ìre II | Burlington, MA | 12 Màrt 2024 | 1 Sult 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| $129,730–$174,200 Ìre II | San Jose, CA | 14 Gearr 2024 | 26 Gearr 2024 | Dearbhaichte |
| $129,730–$174,200 Ìre II | San Jose, CA | 8 Faoi 2024 | 22 Faoi 2024 | Dearbhaichte |
| $151,216–$161,200 Ìre IV | Austin, TX | 13 Dùbh 2023 | 19 Gibl 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| $106,267–$174,200 Ìre II | Folsom, CA | 9 Dàmh 2023 | 23 Dàmh 2023 | Dearbhaichte |
| $109,699–$161,200 Ìre II | Austin, TX | 28 Lùna 2023 | 21 Sult 2023 | Dearbhaichte |
| $158,746–$174,200 Ìre III | San Jose, CA | 25 Lùna 2023 | 11 Sult 2023 | Dearbhaichte |
| $99,341–$161,200 Ìre II | Austin, TX | 26 Ògmh 2023 | 3 Iuch 2023 | Dearbhaichte |
| $95,014–$158,600 Ìre II | Folsom, CA | 9 Ògmh 2023 | 19 Ògmh 2023 | Dearbhaichte |
| $125,486–$158,600 Ìre III | Hillsboro, OR | 2 Ògmh 2023 | 30 Samh 2023 | Dearbhaichte |
| $125,486–$158,600 Ìre III | Hillsboro, OR | 25 Gibl 2023 | 20 Lùna 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| $99,341–$161,200 Ìre II | Austin, TX | 11 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $94,453–$174,200 Ìre II | Irvine, CA | 29 Màrt 2023 | 20 Lùna 2023 | Dearbhaichte |
| $130,354–$174,200 Ìre II | San Jose, CA | 6 Gearr 2023 | 20 Gearr 2023 | Dearbhaichte |
| $130,354–$174,200 Ìre II | San Jose, CA | 3 Gearr 2023 | 13 Gearr 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| $130,354–$174,200 Ìre II | San Jose, CA | 12 Faoi 2023 | 23 Faoi 2023 | Dearbhaichte |
| $130,354–$174,200 Ìre II | San Jose, CA | 12 Faoi 2023 | 23 Faoi 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| $136,947–$174,200 Ìre IV | Torrance, CA | 20 Dùbh 2022 | 9 Faoi 2023 | Dearbhaichte |
| $137,116–$174,200 | San Jose, CA | 19 Dùbh 2022 | 11 Cèit 2023 | Dearbhaichte |
| $136,947–$162,500 Ìre III | San Jose, CA | 20 Lùna 2020 | 25 Faoi 2021 | Dearbhaichte, an uair sin air a tharraing air ais |
Lead Application Engineer aig gach neach-fastaidh →
Obraichean eile aig Cadence Design Systems, Inc.
- Lead Software Engineer$141,378
- Principal Software Engineer$154,606
- Principal Application Engineer$161,179
- Software Engineer II$127,490
- Sr. Principal Software Engineer$167,978
- Lead Design Engineer$126,464
- Principal Design Engineer$156,853
- Principal Product Engineer$161,859
- Sr. Principal Application Engineer$171,350
- Sr. Application Engineer$110,656
- Sr. Principal Design Engineer$177,341
- Software Architect$192,941
- Lead Product Engineer$127,584
- Sr. Principal Product Engineer$167,109
- Design Engineer II$110,656
- Software Engineer$133,807
- Sr. Solutions Engineer - AE$108,181
- Product Engineer II$110,718
- Product Engineering Architect$195,397
- Principal Solutions Engineer - AE$156,916
- Application Engineer$108,722
- Lead Solutions Engineer - AE$126,464
- Scientific Developer I$81,598
- Sr. Principal Solutions Engineer - AE$155,980
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).