Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Cadence Design Systems, Inc. › Scientific Developer I

Scientific Developer I aig Cadence Design Systems, Inc.: Tuarastalan H-1B

8 iarrtasan cumhaichean-obrach airson an dreuchd Scientific Developer I aig Cadence Design Systems, Inc.. Tuarastal bunasach meadhanach $81,598; leth meadhanach $77,750–$91,498.

Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$81,598
Leath mheadhanach nan tuarastalan$77,750–$91,498
Ceudail 10mh–90mh$77,684–$94,413

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20236$79,674
FY20261$94,702

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$94,702–$146,250
Ìre IV
Santa Fe, NM15 Cèit 20251 Dàmh 2025Dearbhaichte, an uair sin air a tharraing air ais
$81,598–$130,000
Ìre III
Santa Fe, NM28 Lùna 20231 Dàmh 2023Dearbhaichte
$94,221–$130,000Santa Fe, NM11 Cèit 20231 Dàmh 2023Dearbhaichte, an uair sin air a tharraing air ais
$88,774–$130,000
Ìre IV
Santa Fe, NM11 Cèit 20231 Dàmh 2023Dearbhaichte
$77,750–$130,000
Ìre III
St. Louis, MO24 Gibl 20231 Dàmh 2023Dearbhaichte
$77,750–$130,000
Ìre III
Santa Fe, NM20 Gibl 20231 Dàmh 2023Dearbhaichte
$77,584–$143,000
Ìre II
Bellevue, WA29 Samh 20225 Dùbh 2022Dearbhaichte
$77,584–$143,000
Ìre II
Bellevue, WA29 Samh 20225 Dùbh 2022Air a tharraing air ais

Obraichean eile aig Cadence Design Systems, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).