Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Clayco, Inc. › Senior Project Engineer

Senior Project Engineer aig Clayco, Inc.: Tuarastalan H-1B

30 iarrtasan cumhaichean-obrach airson an dreuchd Senior Project Engineer aig Clayco, Inc.. Tuarastal bunasach meadhanach $94,500; leth meadhanach $91,000–$100,000.

Iarrtasan (LCAs)30
Tuarastal meadhanach a chaidh a thabhann$94,500
Leath mheadhanach nan tuarastalan$91,000–$100,000
Ceudail 10mh–90mh$90,000–$102,100

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20236$94,500
FY20247$90,000
FY20259$97,000
FY20268$98,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$98,000
Ìre II
St. Louis, MO6 Gibl 202613 Gibl 2026Dearbhaichte
$98,000
Ìre II
Phoenix, AZ12 Màrt 202627 Màrt 2026Dearbhaichte
$95,000
Ìre II
Tempe, AZ24 Samh 202526 Samh 2025Dearbhaichte
$91,000
Ìre II
St. Louis, MO24 Samh 20255 Faoi 2026Dearbhaichte
$92,000
Ìre II
Clarksville, TN20 Samh 202526 Samh 2025Dearbhaichte
$103,000
Ìre III
Santa Teresa, NM17 Samh 202524 Samh 2025Dearbhaichte
$102,000
Ìre II
Santa Teresa, NM4 Samh 202512 Samh 2025Dearbhaichte
$100,000
Ìre II
Santa Teresa, NM3 Samh 202512 Samh 2025Dearbhaichte
$100,000
Ìre II
Hilliard, OH22 Sult 20251 Dàmh 2025Dearbhaichte
$85,000
Ìre II
Lueders, TX18 Sult 202513 Dàmh 2025Dearbhaichte
$97,000
Ìre II
Ellabell, GA22 Lùna 202528 Lùna 2025Dearbhaichte
$102,000
Ìre II
Afton, TX17 Ògmh 202530 Ògmh 2025Dearbhaichte
$94,000
Ìre II
Lithia Springs, GA22 Cèit 20251 Lùna 2025Dearbhaichte
$100,000
Ìre II
Phoenix, AZ21 Cèit 20251 Dàmh 2025Dearbhaichte
$92,581
Ìre II
Hesperia, CA17 Gibl 20251 Dàmh 2025Dearbhaichte
$91,000
Ìre II
New Carlisle, IN11 Dàmh 202421 Dàmh 2024Dearbhaichte
$105,000
Ìre II
Chicago, IL11 Dàmh 20241 Samh 2024Dearbhaichte
$100,000
Ìre II
Florence, SC12 Lùna 202423 Lùna 2024Dearbhaichte
$91,000
Ìre II
Forest Park, IL19 Gibl 202422 Gibl 2024Dearbhaichte
$92,000
Ìre II
Phoenix, AZ18 Gibl 202422 Gibl 2024Dearbhaichte
$90,000
Ìre II
Hilliard, OH29 Màrt 20248 Gibl 2024Dearbhaichte
$90,000
Ìre II
Social Circle, GA5 Faoi 202412 Faoi 2024Dearbhaichte
$88,000
Ìre II
Newnan, GA22 Samh 20231 Dùbh 2023Dearbhaichte
$90,000
Ìre II
Hilliard, OH7 Samh 202315 Samh 2023Dearbhaichte
$105,000
Ìre II
Hilliard, OH1 Sult 202318 Sult 2023Dearbhaichte
$97,000
Ìre II
Overland, MO31 Lùna 20232 Dàmh 2023Dearbhaichte
$92,000
Ìre III
Fayetteville, GA15 Cèit 202322 Cèit 2023Dearbhaichte
$100,000
Ìre III
Phoenix, AZ26 Gibl 202322 Cèit 2023Dearbhaichte
$90,000
Ìre II
Phoenix, AZ9 Màrt 202312 Gibl 2023Dearbhaichte
$92,000
Ìre II
St. Louis, MO28 Gearr 202315 Màrt 2023Dearbhaichte

Senior Project Engineer aig gach neach-fastaidh →

Obraichean eile aig Clayco, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).