Dàta Tuarastail H-1B

Dachaigh › Tiotalan dreuchd › Senior Project Engineer

Senior Project Engineer: Tuarastalan H-1B

Chleachd 626 iarrtasan cumhaichean-obrach an tiotal dreuchd Senior Project Engineer. Tuarastal bunasach meadhanach $107,000; leth meadhanach $94,647–$123,179.

Iarrtasan (LCAs)626
Tuarastal meadhanach a chaidh a thabhann$107,000
Leath mheadhanach nan tuarastalan$94,647–$123,179
Ceudail 10mh–90mh$85,428–$140,890

Laghiche in-imrich, neach-faighinn no neach-fastaidh? Seall do sheirbheis aig mullach na duilleige seo — $99 airson 30 latha →

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
FEV North America, Inc.30$96,408
Clayco, Inc.30$94,500
DeSimone Consulting Engineering D.P.C22$98,098
DPR Construction, A General Partnership20$104,594
Kostal of America, Inc.17$135,000
Webcor Construction LP16$107,370
Moss & Associates, LLC13$80,000
ABB Inc.11$116,000
Burns & Mcdonnell Engineering Company, Inc.9$107,598
Baker Concrete Construction, Inc.7$90,012
Performance Contracting, Inc7$89,700
Ryan Companies US, Inc.6$96,270
Thornton Tomasetti, Inc.6$112,000
BNBuilders, Inc.6$120,286
D'Amato Conversano, Inc.5$83,000
Webber, LLC5$96,000
Sunwell America, Inc.5$110,000
Albanese Solutions, LLC5$163,000
Solar Landscape LLC4$130,000
Ingenics Corporation4$110,000
Hitachi Energy USA Inc.4$125,653
McCarthy Building Companies, Inc.4$81,382
Hathaway Dinwiddie Construction Company4$108,250
Skanska USA Building Inc.4$100,640
Shimmick Construction Company, Inc.4$206,000
Hilmar Cheese Company Inc.4$140,420
Clune Construction Company, LP4$89,731
Subsurface & Tunnel Engineering LLC3$110,552
Abbott Construction LLC3$107,500
Control-Tec, LLC3$129,560
Indus USA Inc3$95,118
Verista, Inc.3$129,064
Milwaukee Electric Tool Corporation3$110,000
Bot Auto CA Inc.3$200,000
Oscar Renda Contracting Inc.3$108,000
Balfour Beatty Construction LLC3$80,000
Jacobs Associates, Inc.3$120,000
Donaldson Company, Inc.3$103,771
IZiel Healthcare Inc3$110,000
Bristol, Inc.3$112,996
Covidien LP3$105,290
Worley Group, Inc.3$150,072
Ampirical Services, Inc.3$169,563
Simerics, Inc.3$139,300
Craft Engineering Studio, PLLC.3$90,695
L.a. Fuess Partners, Inc.3$100,000
Stark Tech Operating Company LLC3$100,000
Mariana Minerals Co.3$147,500
Lamp Rynearson, Inc.3$95,485
Roche Molecular Systems, Inc.3$94,578
Electric Hydrogen Co3$135,000
ISO New England, Inc.2$117,963
Avid Technology, Inc2$142,061
Hendrickson USA, L.L.C.2$116,709
Performance Contracting Group, Inc2$85,428
United Renewable Energy LLC2$130,000
Nextracker LLC2$100,000
Brookfield Renewable DG-US, LLC2$130,000
Lease Crutcher Lewis WA LLC2$117,407
TRICO Companies LLC2$100,000

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$92,934
Ìre II (càileachail)$96,735
Ìre III (eòlach)$112,933
Ìre IV (gu lèir comasach)$132,163

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY2023149$101,733
FY2024159$104,187
FY2025158$108,394
FY2026137$110,042

Bailtean

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).