Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › DocuSign Inc. › Director, Engineering

Director, Engineering aig DocuSign Inc.: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Director, Engineering aig DocuSign Inc.. Tuarastal bunasach meadhanach $273,130; leth meadhanach $266,144–$297,590.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$273,130
Leath mheadhanach nan tuarastalan$266,144–$297,590
Ceudail 10mh–90mh$227,461–$322,050

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$169,437
FY20242$322,050
FY20252$266,144
FY20262$273,130

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$273,130–$314,400Bothell, WA4 Samh 202520 Màrt 2026Dearbhaichte
$273,130–$314,400Seattle, WA4 Samh 202520 Màrt 2026Dearbhaichte
$266,144
Ìre IV
Seattle, WA6 Dùbh 20246 Ògmh 2025Dearbhaichte
$266,144
Ìre IV
Seattle, WA6 Dùbh 20246 Ògmh 2025Dearbhaichte
$322,050
Ìre III
San Francisco, CA5 Gearr 202419 Gearr 2024Dearbhaichte
$322,050
Ìre III
Dublin, CA5 Gearr 202419 Gearr 2024Dearbhaichte
$169,437–$280,000
Ìre III
Seattle, WA19 Cèit 202326 Ògmh 2023Dearbhaichte

Director, Engineering aig gach neach-fastaidh →

Obraichean eile aig DocuSign Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).