Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › DocuSign Inc. › Manager, Engineering

Manager, Engineering aig DocuSign Inc.: Tuarastalan H-1B

20 iarrtasan cumhaichean-obrach airson an dreuchd Manager, Engineering aig DocuSign Inc.. Tuarastal bunasach meadhanach $200,907; leth meadhanach $198,390–$226,150.

Iarrtasan (LCAs)20
Tuarastal meadhanach a chaidh a thabhann$200,907
Leath mheadhanach nan tuarastalan$198,390–$226,150
Ceudail 10mh–90mh$187,599–$233,192

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$164,424
FY20244$232,500
FY202512$200,606
FY20263$200,907

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$200,907–$279,100
Ìre II
Newark, CA22 Faoi 20263 Iuch 2026Dearbhaichte
$200,907–$279,100
Ìre II
San Francisco, CA22 Faoi 20263 Iuch 2026Dearbhaichte
$186,950–$234,400
Ìre III
Round Rock, TX29 Dùbh 202524 Ògmh 2026Dearbhaichte
$200,907–$255,000
Ìre II
Newark, CA16 Sult 202529 Sult 2025Dearbhaichte
$200,907–$255,000
Ìre II
San Francisco, CA16 Sult 202529 Sult 2025Dearbhaichte
$198,390–$235,849
Ìre II
Seattle, WA16 Iuch 202528 Iuch 2025Dearbhaichte
$198,390–$235,849
Ìre II
Bothell, WA16 Iuch 202528 Iuch 2025Dearbhaichte
$229,600–$279,100
Ìre II
Sunnyvale, CA27 Ògmh 202514 Iuch 2025Dearbhaichte
$229,600–$279,100
Ìre II
San Francisco, CA27 Ògmh 202514 Iuch 2025Dearbhaichte
$200,304–$269,000
Ìre II
Union City, CA24 Gearr 202517 Màrt 2025Dearbhaichte
$200,304–$269,000
Ìre II
San Francisco, CA24 Gearr 202517 Màrt 2025Dearbhaichte
$208,005–$228,005
Ìre II
Liberty Hill, TX10 Dùbh 20246 Faoi 2025Dearbhaichte
$187,671–$207,671
Ìre II
Seattle, WA6 Dùbh 202416 Dùbh 2024Dearbhaichte
$187,671–$207,671
Ìre II
Seattle, WA6 Dùbh 202416 Dùbh 2024Dearbhaichte
$232,435–$252,435
Ìre III
Lathrop, CA3 Dùbh 202418 Dùbh 2024Dearbhaichte
$225,000
Ìre II
San Francisco, CA20 Lùna 202414 Dàmh 2024Dearbhaichte
$225,000
Ìre II
San Ramon, CA20 Lùna 202414 Dàmh 2024Dearbhaichte
$240,000San Francisco, CA4 Dàmh 202330 Dàmh 2023Dearbhaichte
$240,000Mountain View, CA4 Dàmh 202330 Dàmh 2023Dearbhaichte
$164,424–$249,000
Ìre III
Lathrop, CA8 Sult 202325 Sult 2023Dearbhaichte

Manager, Engineering aig gach neach-fastaidh →

Obraichean eile aig DocuSign Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).