Dachaigh › Luchd-obrach › DPR Construction, A General Partnership › Senior Project Engineer
Senior Project Engineer aig DPR Construction, A General Partnership: Tuarastalan H-1B
20 iarrtasan cumhaichean-obrach airson an dreuchd Senior Project Engineer aig DPR Construction, A General Partnership. Tuarastal bunasach meadhanach $104,594; leth meadhanach $95,750–$113,000.
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 12 | $105,000 |
| FY2024 | 7 | $104,187 |
| FY2025 | 1 | $95,000 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $95,000–$110,000 Ìre II | Dallas, TX | 20 Ògmh 2025 | 25 Dàmh 2025 | Dearbhaichte |
| $104,187–$150,000 Ìre II | Sacramento, CA | 10 Iuch 2024 | 15 Iuch 2024 | Dearbhaichte |
| $92,685–$112,000 Ìre II | Phoenix, AZ | 22 Cèit 2024 | 20 Dàmh 2024 | Dearbhaichte |
| $115,398–$140,000 Ìre IV | Reston, VA | 10 Gibl 2024 | 6 Cèit 2024 | Dearbhaichte |
| $115,000 Ìre III | Nashville, TN | 17 Faoi 2024 | 5 Gearr 2024 | Dearbhaichte |
| $83,000 Ìre II | Toney, AL | 19 Sult 2023 | 14 Dàmh 2023 | Dearbhaichte |
| $93,000 Ìre II | Phoenix, AZ | 18 Sult 2023 | 18 Sult 2023 | Dearbhaichte |
| $113,000 Ìre II | Fort Lauderdale, FL | 28 Lùna 2023 | 6 Dùbh 2023 | Dearbhaichte |
| $113,000 Ìre II | Fort Lauderdale, FL | 18 Lùna 2023 | 6 Dùbh 2023 | Dearbhaichte |
| $105,000 Ìre II | Newport Beach, CA | 26 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $106,000 Ìre III | Nashville, TN | 11 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $96,000 Ìre II | Waltham, MA | 3 Gibl 2023 | 1 Lùna 2023 | Dearbhaichte |
| $105,000 Ìre II | Newport Beach, CA | 17 Gearr 2023 | 1 Lùna 2023 | Dearbhaichte |
| $98,500 Ìre II | Dallas, TX | 17 Gearr 2023 | 1 Lùna 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| $99,500 Ìre II | Edison, NJ | 3 Gearr 2023 | 1 Lùna 2023 | Dearbhaichte |
| $115,000 Ìre II | Sacramento, CA | 10 Samh 2022 | 12 Dùbh 2022 | Dearbhaichte |
| $125,000 Ìre III | Newport Beach, CA | 26 Sult 2022 | 11 Dàmh 2022 | Dearbhaichte |
| $100,000 Ìre II | Phoenix, AZ | 9 Lùna 2022 | 6 Sult 2022 | Dearbhaichte, an uair sin air a tharraing air ais |
| $108,576 Ìre II | Redwood City, CA | 11 Gibl 2022 | 1 Dàmh 2022 | Dearbhaichte, an uair sin air a tharraing air ais |
| $92,000 Ìre II | Austin, TX | 16 Lùna 2021 | 22 Sult 2021 | Dearbhaichte, an uair sin air a tharraing air ais |
Senior Project Engineer aig gach neach-fastaidh →
Obraichean eile aig DPR Construction, A General Partnership
- Project Engineer (Civil/Construction)$87,173
- Project Manager (Civil/Construction)$116,272
- Project Manager$121,500
- Project Engineer$83,000
- VDC Project Manager$121,750
- Senior Project Engineer (Civil/Construction)$97,760
- Senior VDC Project Engineer$95,000
- VDC Project Engineer$106,038
- Sr. Project Engineer (Civil/Construction)$100,000
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).