Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › EMC Corporation › Manager 2, Software Engineering

Manager 2, Software Engineering aig EMC Corporation: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Manager 2, Software Engineering aig EMC Corporation. Tuarastal bunasach meadhanach $199,752; leth meadhanach $196,214–$212,497.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$199,752
Leath mheadhanach nan tuarastalan$196,214–$212,497
Ceudail 10mh–90mh$191,443–$218,074

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$192,426
FY20241$196,757
FY20252$211,056
FY20262$212,497

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$212,497
Ìre IV
Bentonville, AR13 Samh 202520 Dùbh 2025Dearbhaichte
$212,497
Ìre II
Bentonville, AR30 Sult 202520 Dùbh 2025Dearbhaichte
$195,672Durham, NC16 Dùbh 202428 Màrt 2025Dearbhaichte
$226,440
Ìre II
Santa Clara, CA15 Dàmh 202413 Faoi 2025Dearbhaichte
$196,757
Ìre IV
Bentonville, AR12 Iuch 202412 Sult 2024Dearbhaichte
$199,752
Ìre II
Seattle, WA24 Cèit 202329 Ògmh 2023Dearbhaichte
$185,099
Ìre III
Seattle, WA15 Samh 202228 Samh 2022Dearbhaichte

Obraichean eile aig EMC Corporation

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).