Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › EMC Corporation › Senior Consultant, Product Management

Senior Consultant, Product Management aig EMC Corporation: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Senior Consultant, Product Management aig EMC Corporation. Tuarastal bunasach meadhanach $267,444; leth meadhanach $257,678–$273,617.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$267,444
Leath mheadhanach nan tuarastalan$257,678–$273,617
Ceudail 10mh–90mh$235,584–$277,997

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$238,202
FY20243$267,444
FY20252$277,448

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$282,595
Ìre IV
Seattle, WA23 Gibl 20251 Cèit 2025Dearbhaichte
$272,302
Ìre IV
Seattle, WA9 Gibl 202521 Gibl 2025Dearbhaichte
$274,932
Ìre IV
Hayward, CA19 Lùna 202426 Lùna 2024Dearbhaichte
$251,165
Ìre IV
Hopkinton, MA5 Ògmh 202417 Ògmh 2024Dearbhaichte
$267,444
Ìre IV
Hayward, CA7 Dùbh 202320 Dùbh 2023Dearbhaichte
$212,212
Ìre IV
Cumming, GA6 Sult 20235 Dàmh 2023Dearbhaichte
$264,191
Ìre IV
Santa Clara, CA24 Iuch 202330 Sult 2023Dearbhaichte

Obraichean eile aig EMC Corporation

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).