Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › HDR Engineering, Inc. › Bridge Engineer

Bridge Engineer aig HDR Engineering, Inc.: Tuarastalan H-1B

12 iarrtasan cumhaichean-obrach airson an dreuchd Bridge Engineer aig HDR Engineering, Inc.. Tuarastal bunasach meadhanach $110,272; leth meadhanach $104,967–$116,142.

Iarrtasan (LCAs)12
Tuarastal meadhanach a chaidh a thabhann$110,272
Leath mheadhanach nan tuarastalan$104,967–$116,142
Ceudail 10mh–90mh$96,071–$122,541

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$104,811
FY20243$105,622
FY20253$111,197
FY20263$110,261

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$116,043
Ìre III
Dallas, TX11 Cèit 20263 Samh 2026Dearbhaichte
$110,261
Ìre III
Houston, TX18 Gibl 20261 Dàmh 2026Dearbhaichte
$105,019
Ìre III
Dallas, TX19 Samh 202511 Faoi 2026Dearbhaichte
$123,219
Ìre III
Round Rock, TX5 Ògmh 20255 Dùbh 2025Dearbhaichte
$111,197
Ìre III
Irvine, CA1 Gibl 20251 Dàmh 2025Dearbhaichte
$110,282
Ìre III
Salt Lake City, UT1 Gibl 20251 Dàmh 2025Dearbhaichte
$129,626
Ìre III
Bellevue, WA11 Ògmh 202421 Samh 2024Dearbhaichte
$95,100
Ìre III
Portland, OR20 Cèit 202416 Ògmh 2024Dearbhaichte
$105,622
Ìre III
Portland, OR3 Gibl 20241 Dàmh 2024Dearbhaichte
$104,811
Ìre III
Olympia, WA8 Lùna 20231 Dàmh 2023Dearbhaichte
$93,246
Ìre III
Dallas, TX4 Cèit 20233 Samh 2023Dearbhaichte
$116,438
Ìre III
Walnut Creek, CA17 Dàmh 20226 Samh 2022Dearbhaichte

Bridge Engineer aig gach neach-fastaidh →

Obraichean eile aig HDR Engineering, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).