Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › HDR Engineering, Inc. › Water/Wastewater Coordinator

Water/Wastewater Coordinator aig HDR Engineering, Inc.: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Water/Wastewater Coordinator aig HDR Engineering, Inc.. Tuarastal bunasach meadhanach $90,917; leth meadhanach $83,512–$99,507.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$90,917
Leath mheadhanach nan tuarastalan$83,512–$99,507
Ceudail 10mh–90mh$75,604–$104,915

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$99,507
FY20241$78,000
FY20251$90,917
FY20262$101,026

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$113,027
Ìre I
San Diego, CA1 Gibl 20261 Dàmh 2026Dearbhaichte
$89,024
Ìre I
Las Vegas, NV12 Dùbh 202526 Faoi 2026Dearbhaichte
$90,917
Ìre I
Kansas City, MO2 Ògmh 20251 Dàmh 2025Dearbhaichte
$78,000
Ìre I
St. Louis, MO25 Gibl 20241 Dàmh 2024Dearbhaichte
$99,507
Ìre II
San Diego, CA11 Gibl 20231 Dàmh 2023Dearbhaichte
$72,010
Ìre I
Kansas City, MO11 Gibl 20231 Dàmh 2023Dearbhaichte
$99,507
Ìre II
San Diego, CA10 Gibl 20231 Dàmh 2023Dearbhaichte

Obraichean eile aig HDR Engineering, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).