Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Intel Corporation › Analog Engineering Manager

Analog Engineering Manager aig Intel Corporation: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Analog Engineering Manager aig Intel Corporation. Tuarastal bunasach meadhanach $208,104; leth meadhanach $196,747–$212,451.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$208,104
Leath mheadhanach nan tuarastalan$196,747–$212,451
Ceudail 10mh–90mh$173,672–$217,044

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20243$212,451
FY20252$202,426

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$208,104–$259,425
Ìre IV
Folsom, CA7 Màrt 20256 Sult 2025Dearbhaichte
$196,747–$246,990
Ìre IV
Hillsboro, OR1 Màrt 202531 Lùna 2025Dearbhaichte
$220,106–$312,250
Ìre III
Folsom, CA27 Lùna 20241 Dàmh 2024Dearbhaichte
$158,288–$199,800
Ìre III
Hillsboro, OR23 Màrt 202416 Sult 2024Dearbhaichte
$212,451–$250,410
Ìre IV
Folsom, CA19 Màrt 20243 Sult 2024Dearbhaichte

Obraichean eile aig Intel Corporation

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).