Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › J.B. Hunt Transport, Inc. › Data Engineer III

Data Engineer III aig J.B. Hunt Transport, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Data Engineer III aig J.B. Hunt Transport, Inc.. Tuarastal bunasach meadhanach $97,724; leth meadhanach $91,000–$102,750.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$97,724
Leath mheadhanach nan tuarastalan$91,000–$102,750
Ceudail 10mh–90mh$87,980–$103,650

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$88,483
FY20241$97,724
FY20252$103,500

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$104,250
Ìre II
Lowell, AR8 Cèit 20259 Ògmh 2025Dearbhaichte
$102,750
Ìre II
Lowell, AR20 Faoi 20256 Gearr 2025Dearbhaichte
$97,724
Ìre II
Lowell, AR16 Samh 20231 Dùbh 2023Dearbhaichte
$85,966–$94,100
Ìre II
Lowell, AR11 Dàmh 202225 Dàmh 2022Dearbhaichte
$91,000
Ìre III
Lowell, AR1 Gibl 20201 Dàmh 2020Dearbhaichte, an uair sin air a tharraing air ais

Data Engineer III aig gach neach-fastaidh →

Obraichean eile aig J.B. Hunt Transport, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).