Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › J.B. Hunt Transport, Inc. › Manager I, Engineering & Technology

Manager I, Engineering & Technology aig J.B. Hunt Transport, Inc.: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Manager I, Engineering & Technology aig J.B. Hunt Transport, Inc.. Tuarastal bunasach meadhanach $114,329; leth meadhanach $109,864–$118,664.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$114,329
Leath mheadhanach nan tuarastalan$109,864–$118,664
Ceudail 10mh–90mh$107,186–$121,266

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$114,329

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$130,174
Ìre II
Lowell, AR14 Lùna 202531 Lùna 2025Air a tharraing air ais
$130,174
Ìre II
Lowell, AR14 Lùna 202523 Faoi 2026Air a tharraing air ais
$123,000
Ìre II
Lowell, AR9 Faoi 202323 Faoi 2023Dearbhaichte
$122,470
Ìre II
Lowell, AR9 Faoi 202323 Faoi 2023Air a tharraing air ais
$114,329
Ìre IV
Lowell, AR2 Samh 20223 Gearr 2023Dearbhaichte
$105,400
Ìre IV
Lowell, AR30 Sult 202224 Gearr 2023Dearbhaichte

Obraichean eile aig J.B. Hunt Transport, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).