Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Kiewit Engineering Group Inc. › Bridge Engineer

Bridge Engineer aig Kiewit Engineering Group Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Bridge Engineer aig Kiewit Engineering Group Inc.. Tuarastal bunasach meadhanach $110,000; leth meadhanach $103,242–$129,740.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$110,000
Leath mheadhanach nan tuarastalan$103,242–$129,740
Ceudail 10mh–90mh$95,297–$139,881

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$110,000
FY20262$124,942

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$146,642
Ìre IV
Lone Tree, CO26 Màrt 202622 Sult 2026Dearbhaichte
$103,242
Ìre I
Lone Tree, CO21 Gearr 202610 Lùna 2026Dearbhaichte
$129,740
Ìre IV
Lone Tree, CO21 Lùna 20231 Dàmh 2023Dearbhaichte
$110,000
Ìre III
Woodcliff Lake, NJ27 Dàmh 20229 Samh 2022Dearbhaichte
$90,000Irving, TX4 Dàmh 202217 Dàmh 2022Dearbhaichte

Bridge Engineer aig gach neach-fastaidh →

Obraichean eile aig Kiewit Engineering Group Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).