Dachaigh › Luchd-obrach › Kiewit Engineering Group Inc. › Geotechnical Engineer
Geotechnical Engineer aig Kiewit Engineering Group Inc.: Tuarastalan H-1B
21 iarrtasan cumhaichean-obrach airson an dreuchd Geotechnical Engineer aig Kiewit Engineering Group Inc.. Tuarastal bunasach meadhanach $94,760; leth meadhanach $90,556–$102,877.
Iarrtasan (LCAs)21
Tuarastal meadhanach a chaidh a thabhann$94,760
Leath mheadhanach nan tuarastalan$90,556–$102,877
Ceudail 10mh–90mh$88,150–$121,016
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 2 | $122,500 |
| FY2024 | 4 | $97,350 |
| FY2025 | 5 | $95,295 |
| FY2026 | 10 | $90,638 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $90,721 Ìre I | Omaha, NE | 16 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $125,857 Ìre IV | Lone Tree, CO | 20 Cèit 2026 | 17 Samh 2026 | Dearbhaichte |
| $102,877 Ìre II | Lenexa, KS | 22 Gibl 2026 | 4 Cèit 2026 | Dearbhaichte |
| $88,128 Ìre I | Omaha, NE | 26 Gearr 2026 | 15 Lùna 2026 | Dearbhaichte |
| $88,005 Ìre II | Omaha, NE | 25 Gearr 2026 | 26 Lùna 2026 | Dearbhaichte |
| $90,556 Ìre II | Lenexa, KS | 25 Gearr 2026 | 14 Lùna 2026 | Dearbhaichte |
| $95,064 Ìre II | Houston, TX | 25 Gearr 2026 | 12 Lùna 2026 | Dearbhaichte |
| $88,150 Ìre II | Omaha, NE | 21 Gearr 2026 | 20 Lùna 2026 | Dearbhaichte |
| $94,760 Ìre II | Lone Tree, CO | 18 Gearr 2026 | 14 Lùna 2026 | Dearbhaichte |
| $90,556 Ìre II | Lenexa, KS | 11 Gearr 2026 | 19 Gearr 2026 | Dearbhaichte |
| $121,016 | Lone Tree, CO | 16 Ògmh 2025 | 27 Samh 2025 | Dearbhaichte |
| $93,707 | Lone Tree, CO | 4 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $88,780 | Lenexa, KS | 26 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $95,295 | Houston, TX | 9 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $100,039 Ìre II | Lone Tree, CO | 11 Dàmh 2024 | 28 Dàmh 2024 | Dearbhaichte |
| $113,630 | Lone Tree, CO | 6 Lùna 2024 | 12 Lùna 2024 | Dearbhaichte |
| $94,660 Ìre II | Lenexa, KS | 29 Iuch 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $100,039 Ìre II | Lone Tree, CO | 5 Ògmh 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $90,480 Ìre II | Lone Tree, CO | 16 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $110,000 Ìre IV | Lenexa, KS | 21 Màrt 2023 | 1 Cèit 2023 | Dearbhaichte |
| $135,000 Ìre IV | Houston, TX | 9 Faoi 2023 | 20 Faoi 2023 | Dearbhaichte |
Geotechnical Engineer aig gach neach-fastaidh →
Obraichean eile aig Kiewit Engineering Group Inc.
- Structural Engineer$104,000
- Electrical Engineer$104,000
- Overhead Transmission Engineer$95,000
- Roadway Engineer$99,134
- Electrical Engineer 3$108,386
- Mechanical Engineer$105,282
- Sr. Electrical Engineer$158,100
- Scheduler$99,702
- Structural Engineer 4$147,718
- Bridge Engineer$110,000
- Scheduling Analyst$82,000
- Drainage Engineer$96,075
- IETS Analyst$101,759
- Substation Engineer$100,140
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).