Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › LER TechForce, LLC › Design Engineer

Design Engineer aig LER TechForce, LLC: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Design Engineer aig LER TechForce, LLC. Tuarastal bunasach meadhanach $106,891; leth meadhanach $106,080–$106,891.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$106,891
Leath mheadhanach nan tuarastalan$106,080–$106,891
Ceudail 10mh–90mh$99,653–$111,396

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$95,368
FY20251$106,080
FY20263$106,891

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$114,400
Ìre II
Columbus, IN27 Màrt 20266 Gibl 2026Dearbhaichte
$106,891
Ìre II
Columbus, IN18 Samh 202520 Samh 2025Dearbhaichte
$106,891
Ìre II
Columbus, IN6 Samh 202517 Dùbh 2025Dearbhaichte, an uair sin air a tharraing air ais
$106,080
Ìre II
Columbus, IN27 Faoi 202528 Faoi 2025Dearbhaichte
$95,368
Ìre II
New Hudson, MI12 Dùbh 20229 Faoi 2023Dearbhaichte

Design Engineer aig gach neach-fastaidh →

Obraichean eile aig LER TechForce, LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).