Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › LER TechForce, LLC › Senior Calibration Engineer

Senior Calibration Engineer aig LER TechForce, LLC: Tuarastalan H-1B

23 iarrtasan cumhaichean-obrach airson an dreuchd Senior Calibration Engineer aig LER TechForce, LLC. Tuarastal bunasach meadhanach $107,446; leth meadhanach $98,000–$110,430.

Iarrtasan (LCAs)23
Tuarastal meadhanach a chaidh a thabhann$107,446
Leath mheadhanach nan tuarastalan$98,000–$110,430
Ceudail 10mh–90mh$95,720–$116,400

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20237$98,000
FY20244$109,120
FY20256$107,219
FY20263$110,240

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$106,891
Ìre II
Columbus, IN2 Gibl 20261 Dàmh 2026Dearbhaichte
$110,240
Ìre II
Plymouth, MI3 Dùbh 20253 Dùbh 2025Dearbhaichte
$110,240
Ìre II
Plymouth, MI20 Samh 20252 Dùbh 2025Dearbhaichte, an uair sin air a tharraing air ais
$88,608
Ìre II
Columbus, IN13 Lùna 20251 Sult 2025Dearbhaichte
$111,000
Ìre II
Columbus, IN12 Cèit 20252 Ògmh 2025Dearbhaichte
$113,000
Ìre II
Columbus, IN1 Gibl 202519 Sult 2025Dearbhaichte
$122,720
Ìre II
Chelsea, MI3 Gearr 202524 Gearr 2025Dearbhaichte
$103,438
Ìre II
Columbus, IN31 Dàmh 20247 Màrt 2025Dearbhaichte
$103,438
Ìre II
Columbus, IN25 Dàmh 202417 Faoi 2025Dearbhaichte
$110,240
Ìre II
Auburn Hills, MI18 Sult 20247 Dàmh 2024Dearbhaichte
$108,000
Ìre II
Columbus, IN21 Lùna 20241 Dàmh 2024Dearbhaichte
$116,000
Ìre II
Columbus, IN29 Gibl 202413 Cèit 2024Dearbhaichte
$98,000
Ìre II
Columbus, IN12 Màrt 202411 Sult 2024Dearbhaichte
$110,000
Ìre II
Columbus, IN20 Ògmh 20231 Iuch 2023Dearbhaichte
$92,000
Ìre II
Columbus, IN20 Ògmh 20231 Iuch 2023Air a tharraing air ais
$92,000
Ìre II
Columbus, IN20 Ògmh 20231 Iuch 2023Air a tharraing air ais
$95,000
Ìre II
Columbus, IN1 Cèit 202310 Sult 2023Dearbhaichte
$95,800
Ìre II
Columbus, IN26 Gibl 20231 Dàmh 2023Dearbhaichte
$98,000
Ìre II
Columbus, IN28 Gearr 20238 Màrt 2023Dearbhaichte
$98,000
Ìre II
Columbus, IN28 Gearr 20238 Màrt 2023Air a tharraing air ais
$98,000
Ìre II
Greenwood, IN17 Gearr 202328 Gearr 2023Dearbhaichte
$120,000
Ìre III
Cedar Park, TX16 Faoi 20236 Gearr 2023Dearbhaichte
$98,000
Ìre II
Columbus, IN17 Samh 202212 Dùbh 2022Dearbhaichte

Obraichean eile aig LER TechForce, LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).