Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › M&T Bank › Technology Team Lead

Technology Team Lead aig M&T Bank: Tuarastalan H-1B

11 iarrtasan cumhaichean-obrach airson an dreuchd Technology Team Lead aig M&T Bank. Tuarastal bunasach meadhanach $140,046; leth meadhanach $130,874–$142,708.

Iarrtasan (LCAs)11
Tuarastal meadhanach a chaidh a thabhann$140,046
Leath mheadhanach nan tuarastalan$130,874–$142,708
Ceudail 10mh–90mh$129,418–$150,000

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20236$132,330
FY20245$140,046

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$140,046–$182,625
Ìre IV
Wilmington, DE17 Ògmh 202417 Ògmh 2024Dearbhaichte
$140,046–$182,625
Ìre IV
Wilmington, DE17 Ògmh 202424 Ògmh 2024Dearbhaichte
$142,000
Ìre IV
Buffalo, NY3 Samh 20239 Samh 2023Dearbhaichte
$129,418–$179,000
Ìre IV
Buffalo, NY29 Sult 202316 Dàmh 2023Dearbhaichte, an uair sin air a tharraing air ais
$143,416–$179,000
Ìre IV
Buffalo, NY7 Sult 202318 Sult 2023Dearbhaichte
$129,418–$179,021
Ìre IV
Buffalo, NY15 Lùna 202321 Lùna 2023Dearbhaichte
$132,330–$172,630
Ìre IV
Wilmington, DE29 Ògmh 202311 Iuch 2023Dearbhaichte
$157,477–$206,924
Ìre IV
Wilmington, DE21 Ògmh 20235 Iuch 2023Dearbhaichte
$150,000–$180,000
Ìre IV
Buffalo, NY1 Gearr 202313 Gearr 2023Dearbhaichte, an uair sin air a tharraing air ais
$132,330–$196,924
Ìre IV
Wilmington, DE19 Faoi 20238 Gearr 2023Dearbhaichte
$117,984–$150,000
Ìre IV
Buffalo, NY19 Sult 20225 Dàmh 2022Dearbhaichte, an uair sin air a tharraing air ais

Obraichean eile aig M&T Bank

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).