Dachaigh › Luchd-obrach › M&T Bank › Engineering Team Lead
Engineering Team Lead aig M&T Bank: Tuarastalan H-1B
20 iarrtasan cumhaichean-obrach airson an dreuchd Engineering Team Lead aig M&T Bank. Tuarastal bunasach meadhanach $143,666; leth meadhanach $143,666–$147,118.
Iarrtasan (LCAs)20
Tuarastal meadhanach a chaidh a thabhann$143,666
Leath mheadhanach nan tuarastalan$143,666–$147,118
Ceudail 10mh–90mh$139,014–$147,118
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2024 | 5 | $143,666 |
| FY2025 | 9 | $143,666 |
| FY2026 | 6 | $147,118 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $147,118–$156,030 Ìre IV | Buffalo, NY | 17 Gibl 2026 | 16 Dàmh 2026 | Dearbhaichte |
| $147,118–$164,774 Ìre IV | Buffalo, NY | 9 Màrt 2026 | 26 Ògmh 2026 | Dearbhaichte |
| $147,118–$181,750 Ìre IV | Buffalo, NY | 16 Faoi 2026 | 17 Iuch 2026 | Dearbhaichte |
| $147,118–$160,498 Ìre IV | Buffalo, NY | 16 Faoi 2026 | 17 Iuch 2026 | Dearbhaichte |
| $147,118–$170,912 Ìre IV | Buffalo, NY | 3 Sult 2025 | 15 Faoi 2026 | Dearbhaichte |
| $153,358–$178,058 Ìre IV | Wilmington, DE | 14 Lùna 2025 | 8 Gearr 2026 | Dearbhaichte |
| $143,666–$175,000 Ìre IV | Buffalo, NY | 22 Ògmh 2025 | 15 Iuch 2025 | Dearbhaichte |
| $143,666–$155,986 Ìre IV | Buffalo, NY | 8 Cèit 2025 | 12 Cèit 2025 | Dearbhaichte |
| $143,666–$160,000 Ìre IV | Buffalo, NY | 19 Màrt 2025 | 31 Màrt 2025 | Dearbhaichte |
| $143,666–$151,931 Ìre IV | Buffalo, NY | 5 Màrt 2025 | 24 Lùna 2025 | Dearbhaichte |
| $143,666–$167,018 Ìre IV | Buffalo, NY | 19 Dùbh 2024 | 20 Ògmh 2025 | Dearbhaichte |
| $145,995–$160,700 Ìre IV | Buffalo, NY | 26 Samh 2024 | 26 Samh 2024 | Dearbhaichte |
| $143,666–$163,363 Ìre IV | Buffalo, NY | 22 Samh 2024 | 23 Cèit 2025 | Dearbhaichte |
| $143,666–$154,531 Ìre IV | Buffalo, NY | 3 Sult 2024 | 3 Sult 2024 | Dearbhaichte |
| $146,078–$155,549 Ìre IV | Wilmington, DE | 27 Lùna 2024 | 26 Gearr 2025 | Dearbhaichte |
| $140,046–$175,000 | Wilmington, DE | 2 Iuch 2024 | 5 Lùna 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| $129,418–$165,812 Ìre IV | Buffalo, NY | 17 Ògmh 2024 | 17 Dùbh 2024 | Dearbhaichte |
| $129,730–$161,938 Ìre IV | Kendall Park, NJ | 3 Gibl 2024 | 3 Gibl 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| $140,046–$167,333 Ìre IV | Wilmington, DE | 5 Màrt 2024 | 2 Lùna 2024 | Dearbhaichte |
| $145,860 Ìre IV | Buffalo, NY | 8 Samh 2023 | 7 Cèit 2024 | Dearbhaichte |
Engineering Team Lead aig gach neach-fastaidh →
Obraichean eile aig M&T Bank
- Software Engineer III$127,878
- Software Engineer II$102,877
- Senior Software Engineer$124,800
- Technology Team Lead$140,046
- Technical Engineer IV$141,565
- Technical Engineer III$121,077
- Software Engineer$124,800
- Business Systems Analyst VI$109,138
- Technology Manager$181,917
- Model Risk Analyst I - Validation$64,293
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).