Dachaigh › Luchd-obrach › M.C. Dean, Inc. › Design Engineer Associate
Design Engineer Associate aig M.C. Dean, Inc.: Tuarastalan H-1B
7 iarrtasan cumhaichean-obrach airson an dreuchd Design Engineer Associate aig M.C. Dean, Inc.. Tuarastal bunasach meadhanach $90,000; leth meadhanach $88,774–$92,394.
Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$90,000
Leath mheadhanach nan tuarastalan$88,774–$92,394
Ceudail 10mh–90mh$85,518–$93,673
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2024 | 2 | $93,500 |
| FY2025 | 3 | $90,000 |
| FY2026 | 2 | $88,774 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $87,549 Ìre I | Tysons, VA | 28 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $90,000 Ìre I | McLean, VA | 11 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| $90,000 Ìre I | Tysons, VA | 3 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $92,789 Ìre I | Tysons, VA | 15 Dàmh 2024 | 21 Dàmh 2024 | Dearbhaichte |
| $92,000 Ìre II | Riverdale, MD | 30 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $95,000 Ìre I | Tysons, VA | 30 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $82,472 Ìre I | McLean, VA | 18 Gibl 2022 | 1 Dàmh 2022 | Dearbhaichte, an uair sin air a tharraing air ais |
Obraichean eile aig M.C. Dean, Inc.
- Control Engineer$94,725
- Project Engineer Associate$84,999
- Financial Manager$177,500
- Engineer$101,200
- Project Engineer Staff$98,862
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).