Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › M.C. Dean, Inc. › Project Engineer Staff

Project Engineer Staff aig M.C. Dean, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Project Engineer Staff aig M.C. Dean, Inc.. Tuarastal bunasach meadhanach $98,862; leth meadhanach $96,392–$100,000.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$98,862
Leath mheadhanach nan tuarastalan$96,392–$100,000
Ceudail 10mh–90mh$92,557–$115,000

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20243$96,392
FY20251$125,000
FY20261$98,862

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$98,862
Ìre II
Sandston, VA5 Cèit 20261 Dàmh 2026Dearbhaichte
$125,000
Ìre III
Tysons, VA14 Cèit 20251 Dàmh 2025Dearbhaichte
$96,392
Ìre I
Sandston, VA9 Sult 202413 Sult 2024Dearbhaichte
$90,000
Ìre I
Palmetto, GA14 Lùna 202431 Lùna 2024Dearbhaichte
$100,000
Ìre I
Raleigh, NC30 Gibl 20241 Dàmh 2024Dearbhaichte

Obraichean eile aig M.C. Dean, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).