Dachaigh › Luchd-obrach › NCR Corporation › SW Engineer II
SW Engineer II aig NCR Corporation: Tuarastalan H-1B
15 iarrtasan cumhaichean-obrach airson an dreuchd SW Engineer II aig NCR Corporation. Tuarastal bunasach meadhanach $99,008; leth meadhanach $89,242–$99,008.
Iarrtasan (LCAs)15
Tuarastal meadhanach a chaidh a thabhann$99,008
Leath mheadhanach nan tuarastalan$89,242–$99,008
Ceudail 10mh–90mh$86,499–$99,008
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 11 | $99,008 |
| FY2024 | 3 | $87,485 |
| FY2026 | 1 | $99,008 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $91,000 Ìre I | Atlanta, GA | 15 Sult 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $83,325–$135,600 Ìre I | Atlanta, GA | 12 Iuch 2023 | 1 Dùbh 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| $102,877–$135,600 Ìre II | Atlanta, GA | 12 Iuch 2023 | 11 Sult 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| $99,008–$135,600 Ìre II | Atlanta, GA | 30 Ògmh 2023 | 11 Sult 2023 | Dearbhaichte |
| $99,008–$135,600 Ìre II | Atlanta, GA | 30 Ògmh 2023 | 15 Lùna 2023 | Dearbhaichte |
| $99,008–$135,600 Ìre II | Atlanta, GA | 30 Ògmh 2023 | 15 Lùna 2023 | Dearbhaichte |
| $99,008–$135,600 Ìre II | Atlanta, GA | 15 Ògmh 2023 | 1 Iuch 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| $99,008–$135,600 Ìre II | Atlanta, GA | 15 Ògmh 2023 | 15 Lùna 2023 | Dearbhaichte |
| $99,008–$135,600 Ìre II | Atlanta, GA | 14 Ògmh 2023 | 15 Lùna 2023 | Dearbhaichte |
| $99,008–$135,600 Ìre II | Atlanta, GA | 13 Ògmh 2023 | 15 Lùna 2023 | Dearbhaichte |
| $99,008–$135,600 Ìre II | Atlanta, GA | 18 Cèit 2023 | 15 Lùna 2023 | Dearbhaichte |
| $87,485–$129,600 Ìre II | Atlanta, GA | 10 Ògmh 2022 | 1 Dàmh 2022 | Dearbhaichte, an uair sin air a tharraing air ais |
| $87,485–$129,600 Ìre II | Atlanta, GA | 18 Gibl 2022 | 15 Lùna 2022 | Dearbhaichte, an uair sin air a tharraing air ais |
| $85,842–$124,800 Ìre II | Atlanta, GA | 30 Gibl 2021 | 1 Dàmh 2021 | Dearbhaichte, an uair sin air a tharraing air ais |
| $94,307 Ìre II | Addison, TX | 16 Faoi 2020 | 10 Gearr 2020 | Dearbhaichte, an uair sin air a tharraing air ais |
SW Engineer II aig gach neach-fastaidh →
Obraichean eile aig NCR Corporation
- SW Engineer IV$134,992
- SW Quality Engineer III$97,261
- SW Engineer III$117,426
- SW Quality Engineer II$75,026
- SW Dev Ops Engineer III$116,938
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).