Dachaigh › Luchd-obrach › NCR Corporation › SW Engineer IV
SW Engineer IV aig NCR Corporation: Tuarastalan H-1B
14 iarrtasan cumhaichean-obrach airson an dreuchd SW Engineer IV aig NCR Corporation. Tuarastal bunasach meadhanach $134,992; leth meadhanach $130,813–$136,822.
Iarrtasan (LCAs)14
Tuarastal meadhanach a chaidh a thabhann$134,992
Leath mheadhanach nan tuarastalan$130,813–$136,822
Ceudail 10mh–90mh$123,714–$146,049
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 11 | $134,992 |
| FY2024 | 1 | $136,822 |
| FY2025 | 1 | $112,341 |
| FY2026 | 1 | $142,002 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $142,002–$172,530 Ìre IV | Atlanta, GA | 22 Sult 2023 | 1 Dàmh 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| $158,600 Ìre IV | Atlanta, GA | 18 Sult 2023 | 1 Dùbh 2023 | Dearbhaichte |
| $147,784–$195,600 Ìre IV | Ontario, CA | 28 Lùna 2023 | 8 Faoi 2024 | Dearbhaichte |
| $136,822–$172,530 Ìre IV | Marietta, GA | 30 Ògmh 2023 | 15 Dàmh 2023 | Dearbhaichte |
| $134,992–$172,530 Ìre IV | Addison, TX | 30 Cèit 2023 | 15 Iuch 2023 | Dearbhaichte |
| $134,992–$172,530 Ìre IV | Forth Worth, TX | 10 Gibl 2023 | 21 Ògmh 2023 | Dearbhaichte |
| $130,813–$198,410 | Sunnyvale, CA | 13 Gearr 2023 | 1 Cèit 2023 | Dearbhaichte |
| $130,813–$198,410 | Hercules, CA | 23 Faoi 2023 | 15 Gearr 2023 | Dearbhaichte |
| $123,714–$172,530 | Atlanta, GA | 23 Faoi 2023 | 7 Ògmh 2023 | Dearbhaichte |
| $134,992–$172,530 Ìre IV | Frisco, TX | 19 Faoi 2023 | 6 Gearr 2023 | Dearbhaichte |
| $123,714–$172,350 | Atlanta, GA | 9 Faoi 2023 | 1 Cèit 2023 | Dearbhaichte |
| $134,992–$172,530 Ìre IV | Frisco, TX | 16 Dùbh 2022 | 22 Dùbh 2022 | Dearbhaichte |
| $136,822–$172,530 Ìre IV | Atlanta, GA | 15 Samh 2022 | 1 Dùbh 2022 | Dearbhaichte, an uair sin air a tharraing air ais |
| $112,341–$172,530 Ìre IV | Omaha, NE | 19 Cèit 2022 | 3 Sult 2022 | Dearbhaichte, an uair sin air a tharraing air ais |
SW Engineer IV aig gach neach-fastaidh →
Obraichean eile aig NCR Corporation
- SW Engineer II$99,008
- SW Quality Engineer III$97,261
- SW Engineer III$117,426
- SW Quality Engineer II$75,026
- SW Dev Ops Engineer III$116,938
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).