Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Redwood Materials, Inc. › Chemical Engineer

Chemical Engineer aig Redwood Materials, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Chemical Engineer aig Redwood Materials, Inc.. Tuarastal bunasach meadhanach $115,000; leth meadhanach $115,000–$140,000.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$115,000
Leath mheadhanach nan tuarastalan$115,000–$140,000
Ceudail 10mh–90mh$106,000–$152,000

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$115,000
FY20241$140,000
FY20251$115,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$115,000
E-3 · Ìre II
McCarran, NV12 Samh 202413 Faoi 2025Dearbhaichte
$140,000
E-3 · Ìre IV
McCarren, NV29 Gearr 202422 Gibl 2024Dearbhaichte
$115,000
H-1B1 (Sile) · Ìre III
Carson City, NV2 Ògmh 202323 Samh 2023Dearbhaichte
$160,000
E-3 · Ìre IV
McCarran, NV28 Gearr 202327 Lùna 2023Dearbhaichte
$100,000
Ìre III
Carson City, NV2 Lùna 20216 Lùna 2021Dearbhaichte, an uair sin air a tharraing air ais

Chemical Engineer aig gach neach-fastaidh →

Obraichean eile aig Redwood Materials, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).