Dachaigh › Luchd-obrach › Redwood Materials, Inc. › Chemical Engineer
Chemical Engineer aig Redwood Materials, Inc.: Tuarastalan H-1B
5 iarrtasan cumhaichean-obrach airson an dreuchd Chemical Engineer aig Redwood Materials, Inc.. Tuarastal bunasach meadhanach $115,000; leth meadhanach $115,000–$140,000.
Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$115,000
Leath mheadhanach nan tuarastalan$115,000–$140,000
Ceudail 10mh–90mh$106,000–$152,000
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 3 | $115,000 |
| FY2024 | 1 | $140,000 |
| FY2025 | 1 | $115,000 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $115,000 E-3 · Ìre II | McCarran, NV | 12 Samh 2024 | 13 Faoi 2025 | Dearbhaichte |
| $140,000 E-3 · Ìre IV | McCarren, NV | 29 Gearr 2024 | 22 Gibl 2024 | Dearbhaichte |
| $115,000 H-1B1 (Sile) · Ìre III | Carson City, NV | 2 Ògmh 2023 | 23 Samh 2023 | Dearbhaichte |
| $160,000 E-3 · Ìre IV | McCarran, NV | 28 Gearr 2023 | 27 Lùna 2023 | Dearbhaichte |
| $100,000 Ìre III | Carson City, NV | 2 Lùna 2021 | 6 Lùna 2021 | Dearbhaichte, an uair sin air a tharraing air ais |
Chemical Engineer aig gach neach-fastaidh →
Obraichean eile aig Redwood Materials, Inc.
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).