Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Redwood Materials, Inc. › Mechanical Engineer

Mechanical Engineer aig Redwood Materials, Inc.: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Mechanical Engineer aig Redwood Materials, Inc.. Tuarastal bunasach meadhanach $107,000; leth meadhanach $104,000–$114,125.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$107,000
Leath mheadhanach nan tuarastalan$104,000–$114,125
Ceudail 10mh–90mh$103,948–$115,750

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20241$110,000
FY20254$104,000
FY20261$115,500

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$115,500
Ìre I
Carson City, NV15 Ògmh 20261 Dàmh 2026Dearbhaichte
$104,000
Ìre III
Carson City, NV6 Ògmh 20251 Dàmh 2025Dearbhaichte
$103,895
Ìre III
McCarran, NV2 Ògmh 20251 Dàmh 2025Dearbhaichte
$104,000
Ìre III
Carson City, NV30 Gibl 20251 Dàmh 2025Dearbhaichte
$116,000
Ìre IV
Carson City, NV30 Gibl 20251 Dàmh 2025Dearbhaichte
$110,000
Ìre III
McCarran, NV2 Cèit 202427 Cèit 2024Dearbhaichte

Mechanical Engineer aig gach neach-fastaidh →

Obraichean eile aig Redwood Materials, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).