Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Sandisk Technologies, Inc. › Senior Engineer, VLSI Design Engineering

Senior Engineer, VLSI Design Engineering aig Sandisk Technologies, Inc.: Tuarastalan H-1B

31 iarrtasan cumhaichean-obrach airson an dreuchd Senior Engineer, VLSI Design Engineering aig Sandisk Technologies, Inc.. Tuarastal bunasach meadhanach $127,234; leth meadhanach $124,197–$127,234.

Iarrtasan (LCAs)31
Tuarastal meadhanach a chaidh a thabhann$127,234
Leath mheadhanach nan tuarastalan$124,197–$127,234
Ceudail 10mh–90mh$113,942–$137,372

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20256$124,197
FY202623$127,234

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$137,158–$158,976
Ìre II
Fremont, CA1 Ògmh 20261 Dàmh 2026Dearbhaichte
$137,158–$158,976Milpitas, CA1 Ògmh 20261 Dàmh 2026Dearbhaichte
$113,942–$129,168
Ìre II
Folsom, CA28 Cèit 20261 Dàmh 2026Dearbhaichte
$113,942–$129,168
Ìre II
Folsom, CA28 Cèit 20261 Dàmh 2026Dearbhaichte
$138,982–$150,000Milpitas, CA21 Cèit 20261 Dàmh 2026Dearbhaichte
$138,982–$150,000Milpitas, CA21 Cèit 20261 Dàmh 2026Dearbhaichte
$127,234–$135,896
Ìre I
Milpitas, CA30 Màrt 202629 Sult 2026Dearbhaichte
$127,234–$135,896
Ìre I
Milpitas, CA30 Màrt 202629 Sult 2026Dearbhaichte
$127,234–$135,896
Ìre I
Milpitas, CA27 Màrt 202626 Sult 2026Dearbhaichte
$127,234–$135,896
Ìre I
Fremont, CA27 Màrt 202626 Sult 2026Dearbhaichte
$127,234–$135,896
Ìre I
Milpitas, CA27 Màrt 202626 Sult 2026Dearbhaichte
$127,234–$135,896
Ìre I
Milpitas, CA27 Màrt 202625 Sult 2026Dearbhaichte
$127,234–$135,896
Ìre I
Milpitas, CA27 Màrt 202625 Sult 2026Dearbhaichte
$127,234–$135,896
Ìre I
San Jose, CA27 Màrt 202625 Sult 2026Dearbhaichte
$127,234–$135,896
Ìre I
Milpitas, CA27 Màrt 202625 Sult 2026Dearbhaichte
$127,234–$135,896
Ìre I
Sunnyvale, CA25 Màrt 202623 Sult 2026Dearbhaichte
$127,234–$135,896
Ìre I
Milpitas, CA25 Màrt 202623 Sult 2026Dearbhaichte
$137,372–$137,865Santa Clara, CA24 Màrt 202622 Sult 2026Dearbhaichte
$137,372–$137,865Milpitas, CA24 Màrt 202622 Sult 2026Dearbhaichte
$94,890–$129,168
Ìre I
Folsom, CA18 Màrt 202617 Sult 2026Dearbhaichte
$94,890–$129,168
Ìre I
Folsom, CA18 Màrt 202617 Sult 2026Dearbhaichte
$127,234–$150,000
Ìre I
Milpitas, CA16 Màrt 202615 Sult 2026Dearbhaichte
$127,234–$150,000
Ìre I
Milpitas, CA16 Màrt 202615 Sult 2026Dearbhaichte
$124,197–$142,000
Ìre I
San Jose, CA2 Ògmh 20251 Dàmh 2025Dearbhaichte
$124,197–$142,000
Ìre I
Milpitas, CA2 Ògmh 20251 Dàmh 2025Dearbhaichte
$124,197–$131,300
Ìre I
Milpitas, CA8 Gibl 202517 Sult 2025Dearbhaichte
$124,197–$131,300
Ìre I
Santa Clara, CA8 Gibl 202517 Sult 2025Dearbhaichte
$124,197–$131,300
Ìre I
Milpitas, CA20 Gearr 202521 Ògmh 2025Dearbhaichte
$124,197–$131,300
Ìre I
Milpitas, CA20 Gearr 202521 Ògmh 2025Dearbhaichte
$124,197–$131,300
Ìre I
Milpitas, CA20 Gearr 202521 Ògmh 2025Air a tharraing air ais
$124,197–$131,300
Ìre I
Milpitas, CA20 Gearr 202521 Ògmh 2025Air a tharraing air ais

Obraichean eile aig Sandisk Technologies, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).