Dachaigh › Luchd-obrach › Sandisk Technologies, Inc. › Staff Engineer, Technology Development Engineering
Staff Engineer, Technology Development Engineering aig Sandisk Technologies, Inc.: Tuarastalan H-1B
21 iarrtasan cumhaichean-obrach airson an dreuchd Staff Engineer, Technology Development Engineering aig Sandisk Technologies, Inc.. Tuarastal bunasach meadhanach $144,664; leth meadhanach $136,505–$149,960.
Iarrtasan (LCAs)21
Tuarastal meadhanach a chaidh a thabhann$144,664
Leath mheadhanach nan tuarastalan$136,505–$149,960
Ceudail 10mh–90mh$119,496–$151,091
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2025 | 13 | $149,960 |
| FY2026 | 8 | $136,505 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $136,505–$159,972 Ìre II | Fremont, CA | 16 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $136,505–$159,972 | Fremont, CA | 27 Màrt 2026 | 25 Sult 2026 | Dearbhaichte |
| $136,505–$159,972 | Milpitas, CA | 27 Màrt 2026 | 25 Sult 2026 | Dearbhaichte |
| $137,372–$159,080 | Santa Clara, CA | 27 Màrt 2026 | 25 Sult 2026 | Dearbhaichte |
| $137,372–$159,080 | Milpitas, CA | 27 Màrt 2026 | 25 Sult 2026 | Dearbhaichte |
| $117,683–$159,080 | San Jose, CA | 25 Màrt 2026 | 23 Sult 2026 | Dearbhaichte |
| $117,683–$159,080 | Milpitas, CA | 25 Màrt 2026 | 23 Sult 2026 | Dearbhaichte |
| $148,310–$159,080 | Milpitas, CA | 20 Màrt 2026 | 19 Sult 2026 | Dearbhaichte |
| $149,960–$154,284 | San Jose, CA | 18 Lùna 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $149,960–$154,284 | Milpitas, CA | 18 Lùna 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $151,070–$164,120 Ìre III | San Jose, CA | 7 Iuch 2025 | 11 Dàmh 2025 | Dearbhaichte |
| $151,070–$164,120 Ìre III | Milpitas, CA | 7 Iuch 2025 | 11 Dàmh 2025 | Dearbhaichte |
| $149,960–$153,700 | San Jose, CA | 27 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $149,960–$153,700 | Milpitas, CA | 27 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $151,091–$164,800 Ìre II | Cupertino, CA | 10 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $151,091–$164,800 Ìre II | Milpitas, CA | 6 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $119,496–$153,700 Ìre II | Milpitas, CA | 27 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $119,496–$153,700 Ìre II | Fremont, CA | 27 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $144,664–$153,700 Ìre III | Milpitas, CA | 8 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $144,664–$153,700 Ìre III | Fremont, CA | 8 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $152,324–$153,700 | Milpitas, CA | 12 Samh 2024 | 27 Faoi 2025 | Dearbhaichte |
Obraichean eile aig Sandisk Technologies, Inc.
- Senior Engineer, Industrial Engineering$94,058
- Senior Engineer, VLSI Design Engineering$127,234
- Principal Engineer, Product Development Engineering$178,006
- Senior Engineer, Software Development Engineering (Apps)$136,297
- Staff Engineer, VLSI Design Engineering$129,772
- Principal Engineer, VLSI Design Engineering$165,275
- Staff Engineer, Industrial Engineering$92,976
- Principal Engineer, Packaging Engineering$170,248
- Technologist, Firmware Engineering$198,248
- Senior Engineer, Systems Design Engineering$126,994
- Analyst 4, Business Applications$167,362
- Staff Engineer, Product Development Engineering$132,196
- Staff Engineer, Packaging Engineering$148,655
- Manager 2, Strategic Sourcing$92,976
- Technologist, VLSI Design Engineering$178,006
- Principal Engineer, Software Development Engineering (Apps)$213,512
- Scientist 3, Data Science$174,783
- Senior Engineer, Firmware Verification Engineering$94,162
- Professional 4, Information Technology$149,240
- Staff Engineer, Firmware Verification Engineering$129,792
- Staff Engineer, Software Development Engineering (Apps)$169,576
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).