Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › T-Mobile USA, Inc. › Senior Engineer, Radio Frequency

Senior Engineer, Radio Frequency aig T-Mobile USA, Inc.: Tuarastalan H-1B

23 iarrtasan cumhaichean-obrach airson an dreuchd Senior Engineer, Radio Frequency aig T-Mobile USA, Inc.. Tuarastal bunasach meadhanach $122,326; leth meadhanach $116,044–$132,648.

Iarrtasan (LCAs)23
Tuarastal meadhanach a chaidh a thabhann$122,326
Leath mheadhanach nan tuarastalan$116,044–$132,648
Ceudail 10mh–90mh$113,923–$143,547

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20237$123,932
FY20249$130,394
FY20256$115,489
FY20261$146,067

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$146,067
Ìre III
Denver, CO19 Dùbh 202517 Cèit 2026Dearbhaichte
$115,489Albuquerque, NM12 Cèit 202512 Cèit 2025Dearbhaichte
$113,836Albuquerque, NM17 Dùbh 20242 Gibl 2025Dearbhaichte
$116,599
Ìre III
Mobile, AL25 Sult 202425 Sult 2024Dearbhaichte, an uair sin air a tharraing air ais
$112,455
Ìre III
Coraopolis, PA6 Sult 202424 Faoi 2025Dearbhaichte
$121,396
Ìre III
Draper, UT16 Lùna 20249 Samh 2024Dearbhaichte
$122,326
Ìre III
Atlanta, GA12 Lùna 202417 Faoi 2025Dearbhaichte
$121,396
Ìre III
Draper, UT9 Iuch 20249 Samh 2024Dearbhaichte, an uair sin air a tharraing air ais
$130,761
Ìre III
Tampa, FL12 Ògmh 202427 Samh 2024Dearbhaichte
$157,718
Ìre III
Irvine, CA29 Gibl 202412 Dàmh 2024Dearbhaichte
$145,507
Ìre III
Bothell, WA18 Gibl 202415 Sult 2024Dearbhaichte
$133,790
Ìre III
South Windsor, CT8 Màrt 202430 Lùna 2024Dearbhaichte
$110,316Worthington, OH27 Iuch 202323 Dùbh 2023Dearbhaichte
$135,706
Ìre III
Denver, CO16 Cèit 202317 Cèit 2023Dearbhaichte
$127,548
Ìre III
Norton, MA16 Cèit 202319 Cèit 2023Dearbhaichte
$134,136
Ìre III
Overland Park, KS7 Gibl 202314 Gibl 2023Dearbhaichte, an uair sin air a tharraing air ais
$115,489Albuquerque, NM7 Gibl 202325 Sult 2023Dearbhaichte, an uair sin air a tharraing air ais
$117,069Frisco, TX16 Màrt 202317 Màrt 2023Dearbhaichte
$119,499
Ìre III
Mobile, AL13 Gearr 202321 Gearr 2023Dearbhaichte
$131,506
Ìre III
Overland Park, KS1 Gearr 202310 Gearr 2023Dearbhaichte, an uair sin air a tharraing air ais
$114,270
Ìre III
Franklin, TN18 Faoi 202320 Faoi 2023Dearbhaichte, an uair sin air a tharraing air ais
$123,932Beltsville, MD7 Gibl 202216 Gibl 2022Dearbhaichte, an uair sin air a tharraing air ais
$130,394
Ìre III
Simi Valley, CA31 Lùna 20217 Sult 2021Dearbhaichte, an uair sin air a tharraing air ais

Obraichean eile aig T-Mobile USA, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).