Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › T-Mobile USA, Inc. › Sr Engineer, Systems Design

Sr Engineer, Systems Design aig T-Mobile USA, Inc.: Tuarastalan H-1B

31 iarrtasan cumhaichean-obrach airson an dreuchd Sr Engineer, Systems Design aig T-Mobile USA, Inc.. Tuarastal bunasach meadhanach $127,660; leth meadhanach $118,755–$136,562.

Iarrtasan (LCAs)31
Tuarastal meadhanach a chaidh a thabhann$127,660
Leath mheadhanach nan tuarastalan$118,755–$136,562
Ceudail 10mh–90mh$105,612–$144,453

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY202310$124,648
FY20248$119,872
FY20257$125,514
FY20265$143,400

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$167,025
Ìre IV
Bellevue, WA15 Ògmh 20261 Iuch 2026Dearbhaichte
$139,000
Ìre IV
Bellevue, WA16 Gibl 20261 Dàmh 2026Dearbhaichte
$136,562Frisco, TX12 Gearr 202612 Lùna 2026Dearbhaichte
$143,400Bothell, WA28 Faoi 202616 Gearr 2026Dearbhaichte
$144,823Bellevue, WA17 Samh 202512 Faoi 2026Dearbhaichte, an uair sin air a tharraing air ais
$138,993Herndon, VA9 Sult 202530 Faoi 2026Dearbhaichte
$150,430Concord, CA27 Cèit 20251 Dàmh 2025Dearbhaichte
$117,799
Ìre IV
Overland Park, KS28 Gibl 202510 Ògmh 2025Dearbhaichte
$117,799
Ìre IV
Overland Park, KS25 Gibl 202510 Ògmh 2025Air a tharraing air ais
$125,514Herndon, VA20 Gearr 20251 Lùna 2025Dearbhaichte
$121,532Mason, OH16 Faoi 202511 Iuch 2025Dearbhaichte
$128,900
Ìre III
Bellevue, WA17 Dùbh 202430 Dùbh 2024Dearbhaichte
$118,882
Ìre IV
Overland Park, KS27 Samh 202416 Cèit 2025Dearbhaichte
$104,912Overland Park, KS12 Sult 202423 Sult 2024Dearbhaichte
$106,348Overland Park, KS29 Lùna 202416 Gearr 2025Dearbhaichte
$118,713Frisco, TX19 Iuch 202416 Faoi 2025Dearbhaichte
$132,584
Ìre IV
Frisco, TX19 Iuch 202413 Faoi 2025Dearbhaichte
$131,878Herndon, VA12 Ògmh 20247 Dùbh 2024Dearbhaichte
$105,690Overland Park, KS17 Gibl 202411 Dàmh 2024Dearbhaichte
$121,032Herndon, VA18 Faoi 202416 Iuch 2024Dearbhaichte
$134,795
Ìre II
Herndon, VA29 Sult 202330 Faoi 2024Dearbhaichte
$133,333
Ìre III
Parsippany, NJ15 Lùna 202315 Dàmh 2023Dearbhaichte
$134,795
Ìre II
Reston, VA9 Lùna 202330 Faoi 2024Dearbhaichte, an uair sin air a tharraing air ais
$136,560
Ìre III
Bellvue, WA17 Iuch 20238 Dùbh 2023Dearbhaichte
$121,808Frisco, TX23 Cèit 20236 Samh 2023Dearbhaichte
$96,452
Ìre IV
Overland Park, KS7 Gibl 20231 Dàmh 2023Dearbhaichte
$144,412
Ìre III
Concord, CA31 Màrt 20237 Gibl 2023Dearbhaichte
$126,419Reston, VA6 Dùbh 20225 Ògmh 2023Dearbhaichte
$118,681Reston, VA9 Samh 20219 Cèit 2022Dearbhaichte, an uair sin air a tharraing air ais
$122,877
Ìre III
Bellevue, WA21 Gibl 202124 Gibl 2021Dearbhaichte, an uair sin air a tharraing air ais
$101,846
Ìre IV
Overland Park, KS30 Màrt 20215 Gibl 2021Dearbhaichte, an uair sin air a tharraing air ais

Obraichean eile aig T-Mobile USA, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).