Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › TE Connectivity Corporation › Staff Manufacturing & Process Development Engineer

Staff Manufacturing & Process Development Engineer aig TE Connectivity Corporation: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Staff Manufacturing & Process Development Engineer aig TE Connectivity Corporation. Tuarastal bunasach meadhanach $120,000; leth meadhanach $120,000–$120,000.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$120,000
Leath mheadhanach nan tuarastalan$120,000–$120,000
Ceudail 10mh–90mh$114,000–$123,000

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$120,000
FY20253$120,000
FY20261$110,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$110,000–$140,000
Ìre IV
Middeltown, PA3 Gibl 20261 Dàmh 2026Dearbhaichte
$120,000–$150,000
Ìre IV
Winston-Salem, NC23 Ògmh 20251 Dàmh 2025Dearbhaichte
$125,000–$140,000
Ìre IV
Winston-Salem, NC22 Gibl 202512 Sult 2025Dearbhaichte
$120,000–$150,000
Ìre IV
Winston-Salem, NC18 Gibl 20251 Dàmh 2025Dearbhaichte
$120,000–$130,000
Ìre IV
Secaucus, NJ28 Gearr 202328 Lùna 2023Dearbhaichte

Obraichean eile aig TE Connectivity Corporation

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).