Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Tesla, Inc. › Sr Technical Construction Project Manager

Sr Technical Construction Project Manager aig Tesla, Inc.: Tuarastalan H-1B

35 iarrtasan cumhaichean-obrach airson an dreuchd Sr Technical Construction Project Manager aig Tesla, Inc.. Tuarastal bunasach meadhanach $140,500; leth meadhanach $137,000–$149,250.

Iarrtasan (LCAs)35
Tuarastal meadhanach a chaidh a thabhann$140,500
Leath mheadhanach nan tuarastalan$137,000–$149,250
Ceudail 10mh–90mh$133,000–$155,000

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$133,000
FY202410$150,000
FY20259$137,000
FY202614$143,838

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$146,676
Ìre II
Austin, TX8 Ògmh 20262 Dàmh 2026Dearbhaichte
$136,000
Ìre II
Fremont, CA16 Màrt 202615 Sult 2026Dearbhaichte
$146,676
Ìre II
Fremont, CA13 Màrt 202612 Sult 2026Dearbhaichte
$131,371
Ìre III
Sparks, NV12 Màrt 202611 Sult 2026Dearbhaichte
$147,000
Ìre II
Fremont, CA11 Màrt 202610 Sult 2026Dearbhaichte
$147,000
Ìre II
Fremont, CA11 Màrt 202610 Sult 2026Dearbhaichte
$139,734
Ìre III
Austin, TX23 Gearr 202625 Lùna 2026Dearbhaichte
$140,000
Ìre III
Austin, TX5 Gearr 202616 Màrt 2026Dearbhaichte
$175,000Hayward, CA22 Dùbh 20259 Gearr 2026Dearbhaichte
$133,864Palo Alto, CA4 Dùbh 202526 Faoi 2026Dearbhaichte
$135,000
Ìre III
Austin, TX19 Samh 202518 Gibl 2026Dearbhaichte
$141,000
Ìre III
Austin, TX7 Samh 202511 Gibl 2026Dearbhaichte
$167,164Palo Alto, CA7 Samh 20253 Cèit 2026Dearbhaichte
$155,000
Ìre III
Palo Alto, CA4 Samh 20251 Dùbh 2025Dearbhaichte
$138,054Manor, TX9 Cèit 20258 Samh 2025Dearbhaichte
$138,054Austin, TX9 Cèit 20258 Samh 2025Dearbhaichte
$141,960
Ìre IV
Leander, TX7 Cèit 202511 Dàmh 2025Dearbhaichte
$141,960
Ìre IV
Austin, TX7 Cèit 202511 Dàmh 2025Dearbhaichte
$137,000
Ìre II
Marina Del Rey, CA13 Màrt 202512 Sult 2025Dearbhaichte
$137,000
Ìre II
San Diego, CA13 Màrt 202512 Sult 2025Dearbhaichte
$137,000
Ìre II
San Diego, CA13 Màrt 202512 Sult 2025Dearbhaichte
$137,000
Ìre II
Milpitas, CA13 Màrt 202512 Sult 2025Dearbhaichte
$137,000
Ìre II
Fremont, CA13 Màrt 202512 Sult 2025Dearbhaichte
$131,931
E-3
Austin, TX11 Ògmh 202426 Lùna 2024Air a tharraing air ais
$155,000
Ìre IV
Austin, TX3 Ògmh 20241 Dàmh 2024Dearbhaichte
$125,000
Ìre IV
Austin, TX28 Cèit 20241 Dàmh 2024Dearbhaichte
$127,000
Ìre IV
Austin, TX13 Cèit 20241 Dàmh 2024Dearbhaichte
$133,000Austin, TX9 Gibl 202415 Gibl 2024Dearbhaichte
$156,000Palo Alto, CA16 Màrt 20246 Sult 2024Dearbhaichte
$150,000
E-3
Palo Alto, CA14 Màrt 202425 Màrt 2024Dearbhaichte, an uair sin air a tharraing air ais
$150,000
E-3
Palo Alto, CA11 Màrt 202425 Màrt 2024Dearbhaichte
$145,000Palo Alto, CA26 Gearr 20244 Màrt 2024Dearbhaichte
$155,000Fremont, CA5 Gearr 202412 Gearr 2024Dearbhaichte
$150,000Fremont, CA26 Sult 20232 Dàmh 2023Dearbhaichte
$133,000Austin, TX1 Lùna 202328 Lùna 2023Dearbhaichte

Obraichean eile aig Tesla, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).