Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Tesla, Inc. › Staff Process Engineer

Staff Process Engineer aig Tesla, Inc.: Tuarastalan H-1B

28 iarrtasan cumhaichean-obrach airson an dreuchd Staff Process Engineer aig Tesla, Inc.. Tuarastal bunasach meadhanach $150,430; leth meadhanach $140,746–$157,850.

Iarrtasan (LCAs)28
Tuarastal meadhanach a chaidh a thabhann$150,430
Leath mheadhanach nan tuarastalan$140,746–$157,850
Ceudail 10mh–90mh$137,128–$160,886

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$158,000
FY202411$148,896
FY202514$148,202
FY20261$150,861

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$150,861
Ìre III
Austin, TX5 Samh 20253 Gibl 2026Dearbhaichte
$140,746
Ìre III
Lathrop, CA23 Sult 202529 Sult 2025Dearbhaichte
$140,746
Ìre III
Brookshire, TX23 Sult 202529 Sult 2025Dearbhaichte
$140,746
Ìre III
Lathrop, CA29 Lùna 202528 Samh 2025Dearbhaichte, an uair sin air a tharraing air ais
$140,746
Ìre III
Brookshire, TX29 Lùna 202528 Samh 2025Dearbhaichte, an uair sin air a tharraing air ais
$155,659
Ìre III
Fremont, CA14 Lùna 202520 Dùbh 2025Dearbhaichte
$140,746
Ìre IV
Lathrop, CA14 Iuch 202528 Samh 2025Dearbhaichte, an uair sin air a tharraing air ais
$156,000
Ìre IV
Newark, CA29 Gibl 20251 Dàmh 2025Dearbhaichte
$156,000
Ìre IV
Fremont, CA29 Gibl 20251 Dàmh 2025Dearbhaichte
$128,685
Ìre IV
Austin, TX9 Gibl 20251 Dàmh 2025Dearbhaichte
$128,685
Ìre IV
Austin, TX9 Gibl 20251 Dàmh 2025Dearbhaichte
$157,776
Ìre IV
Union City, CA3 Gibl 202530 Lùna 2025Dearbhaichte
$157,776
Ìre IV
Fremont, CA3 Gibl 202530 Lùna 2025Dearbhaichte
$162,953
Ìre IV
Pflugerville, TX23 Faoi 202525 Iuch 2025Dearbhaichte
$162,953
Ìre IV
Austin, TX23 Faoi 202525 Iuch 2025Dearbhaichte
$160,000Manor, TX16 Sult 20241 Dàmh 2024Dearbhaichte
$160,000Austin, TX16 Sult 20241 Dàmh 2024Dearbhaichte
$141,278Manor, TX20 Lùna 20241 Dàmh 2024Dearbhaichte
$141,278Austin, TX20 Lùna 20241 Dàmh 2024Dearbhaichte
$144,925Austin, TX16 Iuch 202414 Faoi 2025Dearbhaichte
$144,925Austin, TX16 Iuch 202414 Faoi 2025Dearbhaichte
$156,009
Ìre IV
Fremont, CA8 Màrt 20241 Sult 2024Dearbhaichte
$148,896
Ìre IV
Sparks, NV11 Faoi 202422 Faoi 2024Dearbhaichte
$158,072
Ìre IV
Fremont, CA7 Dùbh 202310 Cèit 2024Dearbhaichte
$160,000Fremont, CA20 Samh 202323 Màrt 2024Dearbhaichte
$126,846
Ìre IV
Austin, TX6 Samh 202322 Gibl 2024Dearbhaichte
$150,000
Ìre IV
Fremont, CA8 Cèit 20237 Sult 2023Dearbhaichte
$166,000
Ìre IV
Fremont, CA21 Gibl 202315 Cèit 2023Dearbhaichte

Staff Process Engineer aig gach neach-fastaidh →

Obraichean eile aig Tesla, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).