Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Tesla, Inc. › Staff Technical Construction Project Manager

Staff Technical Construction Project Manager aig Tesla, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Staff Technical Construction Project Manager aig Tesla, Inc.. Tuarastal bunasach meadhanach $161,616; leth meadhanach $148,000–$165,000.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$161,616
Leath mheadhanach nan tuarastalan$148,000–$165,000
Ceudail 10mh–90mh$144,691–$165,000

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20241$142,485
FY20253$165,000
FY20261$161,616

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$161,616
E-3 · Ìre IV
Austin, TX6 Màrt 202626 Lùna 2026Dearbhaichte
$165,000
Ìre III
Fremont, CA7 Iuch 20256 Faoi 2026Dearbhaichte
$165,000
Ìre III
Fremont, CA7 Iuch 20256 Faoi 2026Dearbhaichte
$148,000
E-3 · Ìre IV
Austin, TX24 Màrt 202528 Màrt 2025Dearbhaichte
$142,485
E-3
Austin, TX12 Ògmh 202426 Lùna 2024Dearbhaichte

Obraichean eile aig Tesla, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).