Dachaigh › Luchd-obrach › Ust Healthproof Inc. › Director I - Operations
Director I - Operations aig Ust Healthproof Inc.: Tuarastalan H-1B
6 iarrtasan cumhaichean-obrach airson an dreuchd Director I - Operations aig Ust Healthproof Inc.. Tuarastal bunasach meadhanach $186,846; leth meadhanach $176,800–$196,891.
Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$186,846
Leath mheadhanach nan tuarastalan$176,800–$196,891
Ceudail 10mh–90mh$176,800–$196,891
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 3 | $176,800 |
| FY2026 | 3 | $196,891 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $196,891 Ìre IV | Cumming, GA | 4 Gearr 2026 | 16 Màrt 2026 | Dearbhaichte |
| $196,891 Ìre II | Cumming, GA | 2 Gearr 2026 | 16 Màrt 2026 | Dearbhaichte |
| $196,891 Ìre IV | Cummings, GA | 28 Faoi 2026 | 2 Màrt 2026 | Dearbhaichte |
| $176,800 Ìre IV | Lake Orion, MI | 23 Lùna 2023 | 28 Sult 2023 | Dearbhaichte |
| $176,800 Ìre IV | Troy, MI | 7 Iuch 2023 | 28 Sult 2023 | Dearbhaichte |
| $176,800 Ìre IV | Lake Orion, MI | 27 Ògmh 2023 | 28 Sult 2023 | Dearbhaichte |
Obraichean eile aig Ust Healthproof Inc.
- Lead I - Software Engineering$89,015
- Specialist I - Software Engineering$104,834
- Lead II - Software Engineering$99,508
- Lead II - Software Testing$91,374
- Lead II - Business Analysis$91,182
- Consultant I$109,082
- Lead I - Software Testing$84,462
- Consultant II$116,580
- Project Manager II$125,000
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).