Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › WSP USA Inc. › Assistant Consultant, Civil Engineer

Assistant Consultant, Civil Engineer aig WSP USA Inc.: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Assistant Consultant, Civil Engineer aig WSP USA Inc.. Tuarastal bunasach meadhanach $73,505; leth meadhanach $69,779–$75,000.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$73,505
Leath mheadhanach nan tuarastalan$69,779–$75,000
Ceudail 10mh–90mh$69,018–$79,266

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$70,505
FY20244$75,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$75,000
Ìre I
Irvine, CA23 Cèit 20241 Dàmh 2024Dearbhaichte
$69,035
Ìre I
Phoenix, AZ26 Gibl 20241 Dàmh 2024Dearbhaichte
$75,000
Ìre I
Irvine, CA24 Gibl 20241 Dàmh 2024Dearbhaichte, an uair sin air a tharraing air ais
$83,533
Ìre I
Oakland, CA22 Gibl 20241 Dàmh 2024Dearbhaichte
$72,010
Ìre I
Tucson, AZ2 Cèit 20231 Dàmh 2023Dearbhaichte
$69,000
Ìre I
Lakewood, CO21 Gibl 20231 Dàmh 2023Dearbhaichte

Obraichean eile aig WSP USA Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).