Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › WSP USA Inc. › Water Resources Engineer

Water Resources Engineer aig WSP USA Inc.: Tuarastalan H-1B

28 iarrtasan cumhaichean-obrach airson an dreuchd Water Resources Engineer aig WSP USA Inc.. Tuarastal bunasach meadhanach $92,331; leth meadhanach $83,897–$118,298.

Iarrtasan (LCAs)28
Tuarastal meadhanach a chaidh a thabhann$92,331
Leath mheadhanach nan tuarastalan$83,897–$118,298
Ceudail 10mh–90mh$77,451–$134,784

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$92,331
FY20242$111,613
FY202512$94,983
FY202610$92,414

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$83,366
Ìre I
Durham, NC10 Ògmh 20261 Dàmh 2026Dearbhaichte
$86,944
Ìre II
Durham, NC10 Ògmh 20261 Dàmh 2026Dearbhaichte
$128,107
Ìre IV
Portland, OR9 Ògmh 20261 Dàmh 2026Dearbhaichte
$84,822
Ìre II
Miami, FL27 Gibl 20261 Dàmh 2026Dearbhaichte
$130,624
Ìre IV
Austin, TX24 Gibl 20261 Dàmh 2026Dearbhaichte
$126,880
Ìre IV
Denver, CO20 Gibl 202630 Sult 2026Dearbhaichte
$87,381
Ìre II
San Antonio, TX12 Gibl 20261 Dàmh 2026Dearbhaichte
$94,515
Ìre II
Sunrise, FL12 Gibl 20261 Dàmh 2026Dearbhaichte
$90,314
Ìre I
Seattle, WA20 Màrt 20264 Cèit 2026Dearbhaichte
$124,384
Ìre IV
Dallas, TX30 Sult 202517 Faoi 2026Dearbhaichte
$86,008
Ìre I
Boston, MA12 Sult 202522 Sult 2025Dearbhaichte
$159,661
Ìre IV
Seattle, WA12 Lùna 202516 Dùbh 2025Dearbhaichte
$150,821
Ìre III
Tempe, AZ24 Ògmh 20251 Dàmh 2025Dearbhaichte
$103,958
Ìre II
Houston, TX8 Cèit 20251 Dàmh 2025Dearbhaichte
$65,000
Ìre I
Topeka, KS8 Cèit 20251 Dàmh 2025Dearbhaichte
$80,746
Ìre I
Las Vegas, NV1 Cèit 20251 Dàmh 2025Dearbhaichte
$112,211
Ìre III
West Palm Beach, FL1 Cèit 20251 Dàmh 2025Dearbhaichte
$112,211
Ìre III
West Palm Beach, FL1 Cèit 20251 Dàmh 2025Dearbhaichte
$72,509
Ìre I
Tucson, AZ1 Cèit 20251 Dàmh 2025Dearbhaichte
$84,240
Ìre I
Herndon, VA1 Cèit 20251 Dàmh 2025Dearbhaichte
$83,554
Ìre I
San Diego, CA18 Gibl 20251 Dàmh 2025Dearbhaichte
$105,019
Ìre II
Indianapolis, IN4 Gibl 20251 Dàmh 2025Dearbhaichte
$82,202
Ìre I
Lawrenceville, NJ9 Lùna 20241 Dàmh 2024Dearbhaichte
$141,024
Ìre III
Seattle, WA3 Cèit 20241 Dàmh 2024Dearbhaichte
$72,509
Ìre I
Raleigh, NC2 Cèit 20231 Dàmh 2023Air a tharraing air ais
$92,331
Ìre II
Las Vegas, NV28 Gibl 20231 Dàmh 2023Dearbhaichte
$72,509
Ìre I
Raleigh, NC12 Gibl 20231 Dàmh 2023Dearbhaichte, an uair sin air a tharraing air ais
$92,331
Ìre I
Las Vegas, NV5 Gibl 20231 Dàmh 2023Dearbhaichte

Water Resources Engineer aig gach neach-fastaidh →

Obraichean eile aig WSP USA Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).