Dachaigh › Gnìomhan › Civil Engineers › Fairfax, VA
Civil Engineers ann an Fairfax, VA: Tuarastalan H-1B
81 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Fairfax, VA. Tuarastal bunasach meadhanach $91,000; leth meadhanach $80,184–$109,179.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $76,840 |
| Ìre II (càileachail) | $91,000 |
| Ìre III (eòlach) | $110,552 |
| Ìre IV (gu lèir comasach) | $145,700 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Rummel, Klepper & Kahl, LLP | 16 | $96,720 |
| Hazen and Sawyer, D.P.C. | 8 | $108,856 |
| Gorove/Slade Associates, Inc. | 7 | $88,000 |
| STV Incorporated | 6 | $93,568 |
| Allan Myers, Inc. | 6 | $84,000 |
| Iteris, Inc. | 5 | $69,906 |
| Stantec Consulting Services Inc. | 4 | $90,823 |
| Gannett Fleming, Inc. | 3 | $68,640 |
| CDM Smith Inc. | 3 | $80,351 |
| Microsoft Corporation | 2 | $173,600 |
| FAM Construction, LLC | 2 | $87,785 |
| Genex Systems LLC | 2 | $100,000 |
| 2RW Consultants, Inc. | 2 | $122,000 |
| Michael Baker International, Inc. | 1 | $104,000 |
| C&M Associates, Inc. | 1 | $135,000 |
| PRIME AE Group, Inc. | 1 | $90,000 |
| Geoenv Engineers And Consultants LLC | 1 | $117,000 |
| Infrastructure Consulting and Engineering, LLC | 1 | $90,000 |
| AMA Engineers, LLC | 1 | $84,219 |
| JZ Structural Consulting Inc. | 1 | $70,000 |
| Virginia Department of Transportation | 1 | $156,160 |
| Garney Companies, Inc. | 1 | $72,500 |
| exp U.S. Services Inc. | 1 | $91,000 |
| Greenman-Pedersen, Inc. | 1 | $118,040 |
| GFT Infrastructure, Inc. | 1 | $90,938 |
| Wallace Montgomery and Associates, LLP | 1 | $83,075 |
| Land Development Consultants, Inc. | 1 | $91,000 |
| Bowman Consulting Group, Ltd. | 1 | $76,000 |
Tiotalan dreuchd
- Transportation Engineer5
- Project Engineer5
- Engineer I5
- Project Manager3
- Field Engineer3
- Engineer Signal Optimization2
- Research Engineer2
- Assistant Engineer2
- Principal Scientist2
- Associate Designer, Water2
- Structural Designer2
- Engineer II2
- Project Engineer II2
- Assistant Superintendent2
- Construction Specialist 22
Luchd-taic H-1B ann an Fairfax, VA →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).