Dachaigh › Tiotalan dreuchd › Field Engineer
Field Engineer: Tuarastalan H-1B
Chleachd 488 iarrtasan cumhaichean-obrach an tiotal dreuchd Field Engineer. Tuarastal bunasach meadhanach $78,179; leth meadhanach $72,000–$88,605.
Iarrtasan (LCAs)488
Tuarastal meadhanach a chaidh a thabhann$78,179
Leath mheadhanach nan tuarastalan$72,000–$88,605
Ceudail 10mh–90mh$67,056–$97,859
Laghiche in-imrich, neach-faighinn no neach-fastaidh? Seall do sheirbheis aig mullach na duilleige seo — $99 airson 30 latha →
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|
| Terracon Consultants, Inc. | 42 | $70,200 |
| Kiewit Power Constructors Co. | 19 | $90,220 |
| Webber, LLC | 18 | $74,500 |
| Alamo NEX Construction, LLC | 16 | $70,000 |
| The Lane Construction Corporation | 14 | $80,000 |
| Dragados USA, Inc. | 13 | $85,000 |
| Turner Construction Company | 12 | $75,450 |
| Johnson Brothers Corporation, a Southland Company | 9 | $71,448 |
| Webber Waterworks, LLC | 8 | $73,000 |
| Gilbane Building Company | 8 | $79,414 |
| Keller North America, Inc. | 6 | $76,586 |
| Judlau Contracting, Inc. | 6 | $99,299 |
| Traylor Bros., Inc. | 6 | $87,480 |
| J.F. Edwards Construction Company | 6 | $83,600 |
| PDF Engineering LLC | 6 | $90,875 |
| Big-D Corporation | 5 | $75,036 |
| Railworks Corporation | 5 | $70,824 |
| Schlumberger Technology Corporation | 5 | $80,039 |
| Tecma Associates, Inc | 5 | $79,040 |
| Allan Myers, Inc. | 5 | $76,003 |
| Flatiron Dragados USA, Inc. | 5 | $85,000 |
| Distinct Engineering Solutions Inc | 5 | $93,600 |
| Oscar Renda Contracting Inc. | 5 | $75,000 |
| PLW Waterworks, LLC | 4 | $70,000 |
| TC Electric, LLC | 4 | $84,150 |
| Middlesex Corporation | 4 | $73,716 |
| Kiewit Infrastructure South Co. | 4 | $92,550 |
| McLean Contracting Company | 4 | $81,500 |
| Frank Lill & Son, Inc. | 4 | $64,730 |
| NYC Constructors LLC | 4 | $139,214 |
| M. A. Mortenson Company | 4 | $77,199 |
| TREVIICOS Corporation | 4 | $74,000 |
| Motorola Solutions, Inc. | 4 | $84,947 |
| Kiewit Infrastructure Co. | 4 | $85,800 |
| The Industrial Company | 3 | $79,953 |
| Cameron International Corporation | 3 | $60,944 |
| Midrex Technologies, Inc. | 3 | $103,563 |
| PCL Industrial Construction Co. | 3 | $65,728 |
| Stacy and Witbeck | 3 | $94,000 |
| Tmeic International Corporation | 3 | $88,587 |
| Willmeng Construction, Inc. | 3 | $64,563 |
| Superior Construction Company | 3 | $89,210 |
| SLS Controls Inc | 3 | $104,853 |
| Cordoba Corp. | 3 | $72,842 |
| Alsina Forms Co., Inc. | 3 | $80,558 |
| Kiewit Engineering Group Inc. | 3 | $89,282 |
| Advanced Construction Techniques Inc. | 3 | $71,635 |
| RRC Power and Energy, LLC | 3 | $50,790 |
| Lithko Contracting, LLC | 3 | $83,000 |
| Vinci Construction Grands Projets USA | 3 | $80,400 |
| Reyes TX, Inc. | 3 | $90,000 |
| MLJ Contracting LLC | 3 | $91,166 |
| Pulice Construction Inc. | 3 | $72,800 |
| Domino Data Lab, Inc. | 2 | $127,500 |
| American Bridge Company | 2 | $80,522 |
| Johnson Bros. Corporation, A Southland Company | 2 | $73,122 |
| Hubbard Construction Company | 2 | $75,859 |
| Hybrid Mechanical Corp | 2 | $75,764 |
| AID Equipment Company, LLC | 2 | $71,188 |
| Sundt Construction, Inc. | 2 | $73,133 |
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|
| Ìre I (innte) | $75,016 |
| Ìre II (càileachail) | $85,696 |
| Ìre III (eòlach) | $94,764 |
| Ìre IV (gu lèir comasach) | $137,196 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|
| FY2023 | 60 | $76,836 |
| FY2024 | 97 | $78,208 |
| FY2025 | 144 | $75,452 |
| FY2026 | 167 | $80,000 |
Bailtean
- The Woodlands, TX20
- San Antonio, TX19
- Lenexa, KS13
- New York, NY12
- Norfolk, VA11
- Phoenix, AZ10
- Austin, TX9
- Tempe, AZ8
- Cincinnati, OH7
- Tampa, FL7
- San Francisco, CA6
- Charlotte, NC6
- Great Neck, NY6
- Riverdale, MD6
- Round Rock, TX6
- Dallas, TX6
- Glenview, IL6
- Schaumburg, IL5
- Baltimore, MD5
- Miami, FL5
- Chicago, IL5
- Midland, TX5
- North Brunswick, NJ5
- Pecos, TX4
- Katy, TX4
- Roanoke, VA4
- Virginia Beach, VA4
- Salt Lake City, UT3
- Long Beach, CA3
- Los Angeles, CA3
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).