Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Civil Engineers › Lawrenceville, GA

Civil Engineers ann an Lawrenceville, GA: Tuarastalan H-1B

25 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Lawrenceville, GA. Tuarastal bunasach meadhanach $79,003; leth meadhanach $72,000–$107,598.

Iarrtasan (LCAs)25
Tuarastal meadhanach a chaidh a thabhann$79,003
Leath mheadhanach nan tuarastalan$72,000–$107,598
Ceudail 10mh–90mh$60,944–$126,500

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$60,472
Ìre II (càileachail)$79,250
Ìre III (eòlach)$117,500
Ìre IV (gu lèir comasach)$107,598

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
Ohmshiv Construction, LLC16$75,000
Doka USA, Ltd.2$73,915
William J. Peltier & Associates, Inc.2$130,250
Terracon Consultants, Inc.1$83,500
Walker Consultants, Inc.1$107,598
Gilbane Building Company1$60,944
Haines, Gipson & Associates, Inc.1$100,000
Geo-Hydro Engineers, Inc.1$77,401

Tiotalan dreuchd

Luchd-taic H-1B ann an Lawrenceville, GA →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).