Dachaigh › Gnìomhan › Civil Engineers › Lawrenceville, GA
Civil Engineers ann an Lawrenceville, GA: Tuarastalan H-1B
25 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Lawrenceville, GA. Tuarastal bunasach meadhanach $79,003; leth meadhanach $72,000–$107,598.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $60,472 |
| Ìre II (càileachail) | $79,250 |
| Ìre III (eòlach) | $117,500 |
| Ìre IV (gu lèir comasach) | $107,598 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Ohmshiv Construction, LLC | 16 | $75,000 |
| Doka USA, Ltd. | 2 | $73,915 |
| William J. Peltier & Associates, Inc. | 2 | $130,250 |
| Terracon Consultants, Inc. | 1 | $83,500 |
| Walker Consultants, Inc. | 1 | $107,598 |
| Gilbane Building Company | 1 | $60,944 |
| Haines, Gipson & Associates, Inc. | 1 | $100,000 |
| Geo-Hydro Engineers, Inc. | 1 | $77,401 |
Tiotalan dreuchd
- Civil Engineer12
- Project Engineer3
- Senior Civil Engineer2
- Senior Staff Engineer1
- Structural Project Manager1
- Field Engineer1
- Associate Principal1
- Project Manager (Engineer)1
- Project Super Intendent1
- Project Superintendent1
- Geotechnical Staff Engineer1
Luchd-taic H-1B ann an Lawrenceville, GA →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).