Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Civil Engineers › Lincoln, NE

Civil Engineers ann an Lincoln, NE: Tuarastalan H-1B

27 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Lincoln, NE. Tuarastal bunasach meadhanach $66,126; leth meadhanach $63,586–$78,500.

Iarrtasan (LCAs)27
Tuarastal meadhanach a chaidh a thabhann$66,126
Leath mheadhanach nan tuarastalan$63,586–$78,500
Ceudail 10mh–90mh$55,026–$95,046

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$65,002
Ìre II (càileachail)$78,500
Ìre III (eòlach)$102,500

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
The State of Nebraska, Department of Transportation18$65,333
Board of Regents of the University of Nebraska4$69,284
RO Youker, Inc.2$63,000
Lange Structural Group, LLC1$82,000
WSP USA Inc.1$90,938
Michael Baker International, Inc.1$64,085

Tiotalan dreuchd

Luchd-taic H-1B ann an Lincoln, NE →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).