Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Construction Managers › Charlotte, NC

Construction Managers ann an Charlotte, NC: Tuarastalan H-1B

24 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Charlotte, NC. Tuarastal bunasach meadhanach $91,083; leth meadhanach $73,694–$110,002.

Iarrtasan (LCAs)24
Tuarastal meadhanach a chaidh a thabhann$91,083
Leath mheadhanach nan tuarastalan$73,694–$110,002
Ceudail 10mh–90mh$68,886–$139,000

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$74,347
Ìre II (càileachail)$98,770
Ìre III (eòlach)$125,324
Ìre IV (gu lèir comasach)$156,560

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
China Construction America of South Carolina, Inc.5$81,578
Avm Contractors LLC2$68,453
Hypower LLC2$97,843
HDR Engineering, Inc. of the Carolinas2$84,406
Sundt Construction, Inc.1$140,000
CBT Payroll Services Inc.1$91,083
Lee Construction Company of The Carolinas Inc1$67,600
OCMI, Inc.1$75,000
Cumming Management Group, Inc.1$160,298
DPR Construction, A General Partnership1$115,648
WSP USA Inc.1$115,003
Graycor Construction Company, Inc.1$105,000
Haley & Aldrich, Inc.1$73,694
Fountain Services LLC1$82,000
S.C. Hondros & Associates Inc.1$135,000
United Contractor Services, LLC1$73,694
Metcon, Inc.1$156,560

Tiotalan dreuchd

Luchd-taic H-1B ann an Charlotte, NC →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).