Dachaigh › Gnìomhan › Construction Managers › San Francisco, CA
Construction Managers ann an San Francisco, CA: Tuarastalan H-1B
113 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an San Francisco, CA. Tuarastal bunasach meadhanach $155,000; leth meadhanach $122,824–$175,375.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $100,000 |
| Ìre II (càileachail) | $122,824 |
| Ìre III (eòlach) | $158,173 |
| Ìre IV (gu lèir comasach) | $183,250 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
Tiotalan dreuchd
- Project Manager20
- Assistant Project Manager7
- Associate Director6
- Senior Cost Manager5
- Project Engineer4
- Construction Project Manager3
- Sr. Project Engineer3
- Construction Manager3
- Development Manager3
- Vice President, Development and Construction2
- BIM Manager2
- Senior Project Manager2
- Director2
- Scheduling Engineer2
- Project Manager I2
Luchd-taic H-1B ann an San Francisco, CA →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).