Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Electrical Engineers › Foster City, CA

Electrical Engineers ann an Foster City, CA: Tuarastalan H-1B

72 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Foster City, CA. Tuarastal bunasach meadhanach $157,000; leth meadhanach $136,500–$180,000.

Iarrtasan (LCAs)72
Tuarastal meadhanach a chaidh a thabhann$157,000
Leath mheadhanach nan tuarastalan$136,500–$180,000
Ceudail 10mh–90mh$117,200–$187,842

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$112,591
Ìre II (càileachail)$141,440
Ìre III (eòlach)$167,125
Ìre IV (gu lèir comasach)$186,214

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
Zoox Inc.61$161,500
Alten Technology USA, Inc.4$125,000
Ryzen Solutions3$139,360
Experis US, LLC2$134,056
Motiv Power Systems Inc.1$118,000
Siemens Industry, Inc.1$142,126

Tiotalan dreuchd

Luchd-taic H-1B ann an Foster City, CA →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).