Dachaigh › Gnìomhan › Software Developers › Grafton, WI
Software Developers ann an Grafton, WI: Tuarastalan H-1B
36 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Grafton, WI. Tuarastal bunasach meadhanach $130,000; leth meadhanach $114,332–$144,500.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $87,162 |
| Ìre II (càileachail) | $102,544 |
| Ìre III (eòlach) | $130,000 |
| Ìre IV (gu lèir comasach) | $140,600 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Regal Rexnord Corporation | 25 | $135,000 |
| Connexions Data Inc. | 2 | $113,642 |
| Techwave Consulting Inc | 1 | $102,544 |
| Sunray Systems Inc | 1 | $100,000 |
| Swanktek Inc | 1 | $130,000 |
| Qtech Consulting Group, Inc. | 1 | $113,110 |
| Innovative Intelligent Solutions LLC | 1 | $94,307 |
| Wisdom Infotech Ltd. | 1 | $96,500 |
| Cognitive Data Intelligence LLC. | 1 | $96,600 |
| IT & EBusiness Consulting Services, Inc. | 1 | $121,000 |
| Centene Management Company, LLC | 1 | $147,964 |
Tiotalan dreuchd
- IT ERP Architect4
- IT ERP Product Lead Senior4
- Software Developer3
- IT ERP Product Lead3
- Software Engineer2
- IT ERP Analyst III2
- SAP Analyst2
- IT ERP Analyst, Lead1
- IT Database Product Lead Senior1
- Senior IT ERP Product Lead1
- Manager, IT Infrastructure1
- IT ERP Product Analyst III1
- Business Intelligence Engineer Lead1
- Design Engineer I1
- IT Integration Lead1
Luchd-taic H-1B ann an Grafton, WI →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).